Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking to retain the services of a professional consultant engineering firm to provide services related to construction of the bicentennial trail - phase 2. Work will extend the bicentennial trail and allow for safe pedestrian crossing. The trail extension will convert 2800-feet of rail bed to a hard surfaced 10-foot ada compliant pedestrian use only path that will provide linear connectivity to the existing trail crossing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Welby Jacob Canal Trail Project, Phase 3 (Hawk Signals).
Posted Date
-
Due Date
Jan 13, 2026
Close: Jan 13, 2026
The Welby Jacob Canal Trail Project, Phase 3 (Hawk Signals).
AvailableInvitation to Bid for the Welby Jacob Canal Trail Project, Phase 3 (Hawk Signals).
Posted Date
-
Due Date
Jan 13, 2026
Close: Jan 13, 2026
Invitation to Bid for the Welby Jacob Canal Trail Project, Phase 3 (Hawk Signals).
AvailableDesign & Construction of Chalk Hill Trail Phase 1.
Posted Date
Nov 19, 2025
Due Date
Jan 15, 2026
Release: Nov 19, 2025
Close: Jan 15, 2026
Design & Construction of Chalk Hill Trail Phase 1.
AvailableConstruction of approx. 5.4 miles of Rail Trail; Installation of approx. 1,465 LF of culvert pipe ranging 15" through 36"; Shaping/cleaning of ditches and shoulders for 5.4 miles of Rail Trail; Improvements to four (4) existing rail bridges; Installation of aggregate ballast repair in select areas; Installation of separation fabric, aggregate base course, and aggregate top course for surfacing of the 5.4 miles of Rail Trail; Installation of controlled access gates, signage, bollards, and trail appurtenances; Clearing/grubbing; Excavation/earthwork associated with slip repairs; Restoration Work – Seeding, mulching, disposal of trash/debris.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Construction of approx. 5.4 miles of Rail Trail; Installation of approx. 1,465 LF of culvert pipe ranging 15" through 36"; Shaping/cleaning of ditches and shoulders for 5.4 miles of Rail Trail; Improvements to four (4) existing rail bridges; Installation of aggregate ballast repair in select areas; Installation of separation fabric, aggregate base course, and aggregate top course for surfacing of the 5.4 miles of Rail Trail; Installation of controlled access gates, signage, bollards, and trail appurtenances; Clearing/grubbing; Excavation/earthwork associated with slip repairs; Restoration Work – Seeding, mulching, disposal of trash/debris.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis