Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Operating, financing and construction services for the cumberland public works building.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
New construction of the public works and fleet facility which includes: Disturbance of 11.2 Acres of 22 Acre site. New entry drive from Georgia Highway 110, pavedparking areas, underground water and sewer services, site lighting system; installation of new paved and unpaved parking areas, new irrigation system, new fuel island, chain link fencing, automatic gate system, flag pole, new site sidewalks, site and field grading, detention pond and swales, landscaping; lighting poles, fixtures, circuits, and controls for the new parking lot lighting systems, and all panels and feeders shown on the electrical drawings. 14,000GSF Pre-Engineered Metal Building systems (PEMB) over 4” and 6” reinforced concrete slab, 5 ton bridge carne, storage mezzanine, 2 hour rated steel stud wall between Office areas (5,011GSF) and Shop Areas (9,069GSF), electrical/manual overhead doors, acoustical tile ceilings, gypsum board ceilings, Cabinetry with solid surface and laminated countertops, toilet fixtures, toilet partitions, toilet accessories, exterior storefront systems, ceramic tiling, pipe bollards, carpet tile, Luxury Vinyl Plank (LVT) flooring, painted concrete, rubber floor base, wood and metal doors, hollow metal frames, domestic cold and hot water systems with tank and tankless water heaters, ventilated and heated shop areas with fume extractor(s), exhaust fans, HVAC VRF systems, HVAC Split Systems, HVAC System controller, LED lighting, Low voltage systems, ERRC System, CCTV and DATA, Diesel Fuel Generator, 2 single phase pad mounted transformers connected in high-leg configuration to provide 240V, 3 -phase (high leg) System. Additive Alternates for Additional Garage Storage, Covered Equipment Storage Canopy, Large Equipment Storage Canopy and Covered Repair vehicle Parking.
Posted Date
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Dec 31, 2025
Due Date
Feb 12, 2026
Release: Dec 31, 2025
Close: Feb 12, 2026
New construction of the public works and fleet facility which includes: Disturbance of 11.2 Acres of 22 Acre site. New entry drive from Georgia Highway 110, pavedparking areas, underground water and sewer services, site lighting system; installation of new paved and unpaved parking areas, new irrigation system, new fuel island, chain link fencing, automatic gate system, flag pole, new site sidewalks, site and field grading, detention pond and swales, landscaping; lighting poles, fixtures, circuits, and controls for the new parking lot lighting systems, and all panels and feeders shown on the electrical drawings. 14,000GSF Pre-Engineered Metal Building systems (PEMB) over 4” and 6” reinforced concrete slab, 5 ton bridge carne, storage mezzanine, 2 hour rated steel stud wall between Office areas (5,011GSF) and Shop Areas (9,069GSF), electrical/manual overhead doors, acoustical tile ceilings, gypsum board ceilings, Cabinetry with solid surface and laminated countertops, toilet fixtures, toilet partitions, toilet accessories, exterior storefront systems, ceramic tiling, pipe bollards, carpet tile, Luxury Vinyl Plank (LVT) flooring, painted concrete, rubber floor base, wood and metal doors, hollow metal frames, domestic cold and hot water systems with tank and tankless water heaters, ventilated and heated shop areas with fume extractor(s), exhaust fans, HVAC VRF systems, HVAC Split Systems, HVAC System controller, LED lighting, Low voltage systems, ERRC System, CCTV and DATA, Diesel Fuel Generator, 2 single phase pad mounted transformers connected in high-leg configuration to provide 240V, 3 -phase (high leg) System. Additive Alternates for Additional Garage Storage, Covered Equipment Storage Canopy, Large Equipment Storage Canopy and Covered Repair vehicle Parking.
AvailablePublic works/engineering building expansion project.
Posted Date
Jan 5, 2026
Due Date
Jan 28, 2026
Release: Jan 5, 2026
Close: Jan 28, 2026
Public works/engineering building expansion project.
AvailableSeeking to conduct a public works department staffing study.
Posted Date
Jan 8, 2026
Due Date
Jan 27, 2026
Release: Jan 8, 2026
Close: Jan 27, 2026
Seeking to conduct a public works department staffing study.
AvailableThe work is described generally as, but not limited to, new construction of a single-story public works utilities administration building and new secured parking area, which includes ac paving, two electric vehicle charging stations and parking lot lighting.
Posted Date
Dec 19, 2025
Due Date
Jan 29, 2026
Release: Dec 19, 2025
Close: Jan 29, 2026
The work is described generally as, but not limited to, new construction of a single-story public works utilities administration building and new secured parking area, which includes ac paving, two electric vehicle charging stations and parking lot lighting.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →