Illinois Department of Transportation
State AgencyIL
Posted
Oct 2, 2026
Nov 6, 2026
Bridge and Roadway Reconstruction On US 20 Over I-90 From 0.4 Miles West of Wheeler Rd To 0.1 Miles East of Ipsen Rd.
Work includes approx 1,850 LF temporary fence: 129,073 CY earth excavation: 14,600 SY geotechnical fabric for ground stabilization: 31,450 CY topsoil excavation and placement. See outside link.
