Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Consists in general of repair or replacement of existing culverts associated with the annual resurfacing projects. The project will also include but not limited to site specific culvert replacement work may also include minor HMA/Concrete work and site restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of construction services for the replacement of a culvert, sanitary sewer, and roadway on Farmwood Blvd, Concord NC.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Procurement of construction services for the replacement of a culvert, sanitary sewer, and roadway on Farmwood Blvd, Concord NC.
AvailableRemoval of an existing culvert and replacement.
Posted Date
Dec 29, 2025
Due Date
Feb 5, 2026
Release: Dec 29, 2025
Close: Feb 5, 2026
Removal of an existing culvert and replacement.
AvailableProject consists of culvert replacement.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Project consists of culvert replacement.
AvailableWork includes removing the existing dual 90-inch corrugated metal pipe; installing 62 linear feet of dual 14' x 7' precast concrete box culvert with cast-in-place headwalls; replacing the existing 8-inch sanitary sewer; reconstructing roadway pavement; and performing all associated appurtenant work.
Posted Date
Nov 17, 2025
Due Date
Jan 15, 2026
Release: Nov 17, 2025
Close: Jan 15, 2026
Work includes removing the existing dual 90-inch corrugated metal pipe; installing 62 linear feet of dual 14' x 7' precast concrete box culvert with cast-in-place headwalls; replacing the existing 8-inch sanitary sewer; reconstructing roadway pavement; and performing all associated appurtenant work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →