Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct pedestrian mobility improvements to include roadway, sidewalks, curbs, driveway approaches, raised medians, pavement markings, drainage structure, trees, irrigation, traffic signal at General McMullen and utility improvements to include SAWS-Water, SAWS-Sewer, CPS-Gas. Bid items: 10,515 CY street excavation; 56 SY of 15" depth conc pavement, via bus shelter foundation; 491 LF of 3'X3' precast reinf conc box culverts; 321 SY of 4" thickness conc riprap; 12,843 LF of 4" wide white line. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 18 MO traffic control items (signs, barricades, channelizing devices); 4 EA traffic control message boards; 1 LS traffic control police assistance; 1,394 SY block sodding; 5 AC clear right of way; 18,809 SY street excavation incl asphalt removal; 16,911 SY 2" hmac type d (includes tack coat); 16,911 SY 3" hmac type b (includes tack coat); 16,911 SY one course surf treatment (underseal); 18,809 SY 12" crushed limestone base (type a, grade 1-2); 10,328 SF concrete driveway demoliton. See attached file.
Posted Date
Jan 19, 2026
Due Date
Feb 18, 2026
Release: Jan 19, 2026
Close: Feb 18, 2026
Work includes 18 MO traffic control items (signs, barricades, channelizing devices); 4 EA traffic control message boards; 1 LS traffic control police assistance; 1,394 SY block sodding; 5 AC clear right of way; 18,809 SY street excavation incl asphalt removal; 16,911 SY 2" hmac type d (includes tack coat); 16,911 SY 3" hmac type b (includes tack coat); 16,911 SY one course surf treatment (underseal); 18,809 SY 12" crushed limestone base (type a, grade 1-2); 10,328 SF concrete driveway demoliton. See attached file.
AvailableWork consist of 75 LF of pipe, w dia. 12" type (all depths), including excavation and backfill, 131 LF of pipe, w dia. 2" type (all depths), including excavation and backfill, 1058 LF of pipe, w dia. 8" type (all depths), including excavation and backfill, 67 SY of removing concrete (riprap), 1733 SY of removing concrete (sidewalks), 597 SY of removing concrete (driveways), 87 SY of removing concrete (misc), 5413 LF of removing concrete (curb or curb & gutter), 320 SY of removing stab base and asphalt pavement (2"), 693 sy of removing stab base & asphalt pavement (0"-10"), 17342 SY of removing stab base & asphalt pavement (6" - 8"). See attached file.
Posted Date
Jan 5, 2026
Due Date
Feb 19, 2026
Release: Jan 5, 2026
Close: Feb 19, 2026
Work consist of 75 LF of pipe, w dia. 12" type (all depths), including excavation and backfill, 131 LF of pipe, w dia. 2" type (all depths), including excavation and backfill, 1058 LF of pipe, w dia. 8" type (all depths), including excavation and backfill, 67 SY of removing concrete (riprap), 1733 SY of removing concrete (sidewalks), 597 SY of removing concrete (driveways), 87 SY of removing concrete (misc), 5413 LF of removing concrete (curb or curb & gutter), 320 SY of removing stab base and asphalt pavement (2"), 693 sy of removing stab base & asphalt pavement (0"-10"), 17342 SY of removing stab base & asphalt pavement (6" - 8"). See attached file.
Release: Jan 8, 2026
Close: Jan 28, 2026
Road preventative maintenance.
AvailableThis RFP is for the resurfacing of Contreras Road and Johnson Road in the Community of Anza.
Posted Date
-
Due Date
Feb 4, 2026
Close: Feb 4, 2026
This RFP is for the resurfacing of Contreras Road and Johnson Road in the Community of Anza.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis