CityCA
Posted
Aug 28, 2026
Sep 23, 2026
Traffic Signal Modifications - Clark Avenue and Cedar Street RFP
Work consists of traffic signal modifications.
Description: Waukesha County is soliciting bids for CTH ES/Edgewood Avenue Traffic Signal Underground as an active public works bid. The posting lists a Bid Sheet, Plans, and a project attachment, with no pre-bid conference and no bid bond listed. Bids are due September 22, 2026, at 10:30 AM Central Time.
County · WI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Waukesha County.
Adjacent opportunities open for bidding right now.
CityCA
Posted
Aug 28, 2026
Sep 23, 2026
Work consists of traffic signal modifications.
CityIA
Posted
Sep 3, 2026
Sep 24, 2026
The proposed improvements include installing a new traffic signal.
CityCO
Posted
-
Oct 8, 2026
The City of Arvada is soliciting design services for 80th Avenue Signal Improvements under solicitation 26-ENG-008. The posting shows publication on 09/10/2026 and a closing deadline of 10/08/2026 at 02:00 PM MDT, which is after the current date of 2026-09-12. The publicly accessible posting does not expose a detailed scope or downloadable solicitation document and does not identify the procurement as a grant program.
CityFL
Posted
Aug 20, 2026
Sep 23, 2026
Work includes 1 LS clearing & grubbing, and site preparation; 4 EA tree removal; 37 CY site excavation (grass swale); 900 LF concrete curb and gutter, type f curb; 85 LF concrete curb, type d curb; 840 SY sod (bahia type); 260 SY concrete sidewalk; 750 SY milling existing asphalt pavement, 1-1/2" average depth; 190 SY 1-1/2" asphalt surface (type sp-9. 5), asphalt pavement, base lift; 190 SY 8" limerock base; 150 LF thermoplastic, standard, white, solid, 12" for crosswalk.