Summary
Teaching Pool Re-Plastering & Lap Pool Acid Wash Project. Teaching Pool - Re-Plastering Project: The contractor shall be responsible for the complete draining of the teaching pool prior to the start of work. Upon completion of all plastering and installation work, the contractor shall be responsible for refilling the teaching pool and coordinating the initial water fill process in accordance with industry standards to protect the new finish. Surface Preparation. Prepare the existing teaching pool interior to properly accept a new surface finish. Perform a complete acid wash of the teaching pool interior to clean and etch the existing surface. Subsurface Bonding. Supply and install a multicoat scratch kote subsurface to the entire teaching pool interior. Multicoat shall function as a bonding agent to enhance adhesion between the existing surface and the new finish. Multicoat applications shall include coverage over existing step tile in preparation for new step tile installation. Lap Pool - Acid Wash Project: Pool Draining and Refilling. The contractor shall be responsible for draining the lap pool prior to the start of the acid
wash process. Upon completion of all work, the contractor shall be responsible for refilling the lap pool and assisting with the startup process. Cleaning & Surface Treatment. Perform a complete acid wash and pressure wash of the lap pool interior. Sand rough surface areas as necessary, not to exceed 300 SF.