Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of four new odor control systems for Pump Station 6 (PS 6), Pump Station 6A (PS 6A), Junction Boxes, 1E and 1F, and Headworks A Grit Basin including foul air duct and supports; Installation of aluminum cover plate at Headworks A Grit Basins effluent channel; Replacement of slide gates at PS 6 and PS 6A and demolition of weir gates at PS 6; Corrosion improvements at PS 6 middle flume and screen channel; Relocation of 18" and 24" drain lines from discharging to the PS 6 middle flume to manhole S-MH-069; Electrical and Instrumentation and control improvements at influent junction boxes 1E and 1F.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Close: Jan 6, 2026
Provide crws nutrient improvements.
AvailableMill branch WWPS HVAC & odor control improvements.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Mill branch WWPS HVAC & odor control improvements.
AvailableThe Washington Suburban Sanitary Commission (WSSC) is soliciting bids for the Mill Branch WWPS HVAC and Odor Control Improvements, encompassing HVAC, plumbing, odor control, and related mechanical/electrical/structural upgrades. The project requires contractors experienced in water and wastewater mechanical process improvements and will be awarded to the lowest responsive and responsible bidder; bids must include a lump sum price and unit prices for contingent work. Bidding opens 2025-12-08 and closes 2026-01-13; a pre-bid/site visit is scheduled for 2025-12-17 and questions are due by 2025-12-29.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
The Washington Suburban Sanitary Commission (WSSC) is soliciting bids for the Mill Branch WWPS HVAC and Odor Control Improvements, encompassing HVAC, plumbing, odor control, and related mechanical/electrical/structural upgrades. The project requires contractors experienced in water and wastewater mechanical process improvements and will be awarded to the lowest responsive and responsible bidder; bids must include a lump sum price and unit prices for contingent work. Bidding opens 2025-12-08 and closes 2026-01-13; a pre-bid/site visit is scheduled for 2025-12-17 and questions are due by 2025-12-29.
Project scope includes the construction of a fourth anaerobic digester tank with a reactor volume of 3 million gallons (3 mg) to provide additional digestion capacity, redundancy, and operating volume versus existing digester nos. 1, 2, and 3. A dedicated digester mixing system for proposed digester no. 4 which will consist of an externally pumped, hydraulically mixed nozzle system that will mix the digester contents using hydraulic jets. A cooling heat exchanger to maintain optimum process temperatures for proposed digester no. 4. See attached file.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Project scope includes the construction of a fourth anaerobic digester tank with a reactor volume of 3 million gallons (3 mg) to provide additional digestion capacity, redundancy, and operating volume versus existing digester nos. 1, 2, and 3. A dedicated digester mixing system for proposed digester no. 4 which will consist of an externally pumped, hydraulically mixed nozzle system that will mix the digester contents using hydraulic jets. A cooling heat exchanger to maintain optimum process temperatures for proposed digester no. 4. See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis