Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide construction services for the installation of a new Tennis Court. The Project will consist of demolition of existing tennis court, fencing, grinding of asphalt, level and compact grinding, concrete slab, ADA pathway, sports court surface done with Plexipave, new basketball hoops, and a concrete drainage system. Contractor shall begin work as soon as materials are procured and seasonal weather conditions permit. Approx. 1 LS Construct Sports Court (approx. 7,200 SF); 2 LS Basketball Goal System; 1 LS Sports Court Combined Tennis/Volleyball Post and Net System; 1 LS Install Sport Court Surfacing; 175 LF Concrete path - ADA Accessible Pathway - 4 ft wide concrete; 1 LS oncrete Pad, 5'x5'; 360 LF Install Fence; 1 LS Install Entrance Gate. See attached file
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Interior renovations for the City of Lynchburg Circuit Court, encompassing lobby reconfiguration, restroom improvements, ADA ramp installation, and main entrance canopy addition across approximately 1200 square feet, to be completed while the building is occupied.
Posted Date
Nov 21, 2025
Due Date
Jan 13, 2026
Release: Nov 21, 2025
Close: Jan 13, 2026
Interior renovations for the City of Lynchburg Circuit Court, encompassing lobby reconfiguration, restroom improvements, ADA ramp installation, and main entrance canopy addition across approximately 1200 square feet, to be completed while the building is occupied.
AvailableThe City of Lynn, Massachusetts is soliciting sealed bids for exterior renovations/restoration work at the historic High Rock Cottage. This Invitation for Bids sets a submission deadline of January 20, 2026 at 2:00 PM Eastern via the official COMMBUYS listing. Full specifications and bid documents are available through the official posting; this is a construction procurement and not a grant.
Posted Date
-
Due Date
Jan 20, 2026
Close: Jan 20, 2026
The City of Lynn, Massachusetts is soliciting sealed bids for exterior renovations/restoration work at the historic High Rock Cottage. This Invitation for Bids sets a submission deadline of January 20, 2026 at 2:00 PM Eastern via the official COMMBUYS listing. Full specifications and bid documents are available through the official posting; this is a construction procurement and not a grant.
AvailableThis project consists of interior upgrades, including restroom upgrades with corresponding plumbing upgrades, flooring replacement, interior slab repairs and slab stabilization. The exterior upgrades within this project include window replacements, minor roof edge repairs, exterior wall repairs, existing tree pruning, and existing sidewalk replacement at noted locations.
Posted Date
Jan 6, 2026
Due Date
Feb 4, 2026
Release: Jan 6, 2026
Close: Feb 4, 2026
This project consists of interior upgrades, including restroom upgrades with corresponding plumbing upgrades, flooring replacement, interior slab repairs and slab stabilization. The exterior upgrades within this project include window replacements, minor roof edge repairs, exterior wall repairs, existing tree pruning, and existing sidewalk replacement at noted locations.
AvailableProject includes interior renovations to the first floor of the circuit court. Work includes lobby reconfiguration; restroom improvements; addition of ADA ramp to main entrance; and addition of canopy to main entrance. The interior renovation area is approx 1200 SF. The building will be occupied during the renovation.
Posted Date
Nov 25, 2025
Due Date
Jan 13, 2026
Release: Nov 25, 2025
Close: Jan 13, 2026
Project includes interior renovations to the first floor of the circuit court. Work includes lobby reconfiguration; restroom improvements; addition of ADA ramp to main entrance; and addition of canopy to main entrance. The interior renovation area is approx 1200 SF. The building will be occupied during the renovation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis