Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Approx 2,500 CY Excavation - Channel and Pond; 1,800 CY Common Borrow Special (CV); 90 LF 30" RC Pipe Storm Sewer; 1,500 CY Random Riprap Class II-IV; 320 SY Reinforced Soil Slope; 570 LF Toewood Bench; etc.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project includes stream stabilization along the river to include but not limited to: grading, excavation, and select structure placement to stabilize the eroding stream bank. Structures to be utilized include rock cross vanes, constructed stone riffles, and live stakes. Stream banks and riparian will be planted with native trees, shrubs, and grasses.
Posted Date
Nov 18, 2025
Due Date
Jan 20, 2026
Release: Nov 18, 2025
Close: Jan 20, 2026
The project includes stream stabilization along the river to include but not limited to: grading, excavation, and select structure placement to stabilize the eroding stream bank. Structures to be utilized include rock cross vanes, constructed stone riffles, and live stakes. Stream banks and riparian will be planted with native trees, shrubs, and grasses.
Premium
Access the largest public sector contact database
Golf stream stabilization and associated items of work.
Posted Date
Nov 24, 2025
Due Date
Dec 22, 2025
Release: Nov 24, 2025
Close: Dec 22, 2025
Golf stream stabilization and associated items of work.
AvailableConstruction of approximately 265 LF of restored stream, reconnected floodplain, rebuilt bank, and in-stream structures.
Posted Date
Jul 12, 2025
Due Date
Jan 28, 2026
Release: Jul 12, 2025
Close: Jan 28, 2026
Construction of approximately 265 LF of restored stream, reconnected floodplain, rebuilt bank, and in-stream structures.
AvailableThe USDA Forest Service, Pacific Northwest Region (Region 6) is soliciting proposals for in-stream and log hauling services to support the Wind River Mining Reach Phase II restoration project to improve salmon habitat. Work includes transporting and placing large woody debris, constructing log jams, directional pulling with cable yarders, excavator operations with grapple and choker setters, skidder operations, and log truck hauling; the contract uses a mix of Firm Fixed Price and Time & Materials CLINs and includes incentive payments tied to root-wad protection. This solicitation is a Total Small Business set-aside (NAICS 115310) with proposals due Jan 19, 2026 and a base performance period described in the opportunity materials (GovTribe notes Feb 1, 2026–Jan 31, 2031).
Posted Date
Dec 17, 2025
Due Date
Jan 19, 2026
Release: Dec 17, 2025
Close: Jan 19, 2026
The USDA Forest Service, Pacific Northwest Region (Region 6) is soliciting proposals for in-stream and log hauling services to support the Wind River Mining Reach Phase II restoration project to improve salmon habitat. Work includes transporting and placing large woody debris, constructing log jams, directional pulling with cable yarders, excavator operations with grapple and choker setters, skidder operations, and log truck hauling; the contract uses a mix of Firm Fixed Price and Time & Materials CLINs and includes incentive payments tied to root-wad protection. This solicitation is a Total Small Business set-aside (NAICS 115310) with proposals due Jan 19, 2026 and a base performance period described in the opportunity materials (GovTribe notes Feb 1, 2026–Jan 31, 2031).