Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide industrial grade crossties.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
To furnish and deliver VDOT approved bridge timbers.
Posted Date
Jan 2, 2026
Due Date
Jan 20, 2026
Release: Jan 2, 2026
Close: Jan 20, 2026
To furnish and deliver VDOT approved bridge timbers.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of: remove and replace 15 crossties; remove and replace 15 "switch" crossties; gage rail at new ties to 56. 5"; re-install tie plates; furnish and install new spikes; power tamp all new crossties; dress stone to the top of the crosstie; haul crossties.
Posted Date
Jan 8, 2026
Due Date
Jan 23, 2026
Release: Jan 8, 2026
Close: Jan 23, 2026
Work consists of: remove and replace 15 crossties; remove and replace 15 "switch" crossties; gage rail at new ties to 56. 5"; re-install tie plates; furnish and install new spikes; power tamp all new crossties; dress stone to the top of the crosstie; haul crossties.
AvailableWork includes procure 30' x 60' timber frame pavilion kit (size can vary slightly if necessary) there is no preferred vendor, but the manufacturer must be located within the united states to meet grant requirements min 1,800 SF coverage area with shingles and gable roof design; kit must include all structural timbers, hardware, roofing materials, and assembly hardware; existing slab removal: demolish and remove existing concrete pad (56' x 63. 5', approx 3,556 SF); saw cut existing slab as necessary to minimize damage to adjacent areas; remove all concrete debris, reinforcement, and related materials from site; dispose of all demolition materials at approved facilities per local regulations. See attached file.
Posted Date
Dec 11, 2025
Due Date
Jan 29, 2026
Release: Dec 11, 2025
Close: Jan 29, 2026
Work includes procure 30' x 60' timber frame pavilion kit (size can vary slightly if necessary) there is no preferred vendor, but the manufacturer must be located within the united states to meet grant requirements min 1,800 SF coverage area with shingles and gable roof design; kit must include all structural timbers, hardware, roofing materials, and assembly hardware; existing slab removal: demolish and remove existing concrete pad (56' x 63. 5', approx 3,556 SF); saw cut existing slab as necessary to minimize damage to adjacent areas; remove all concrete debris, reinforcement, and related materials from site; dispose of all demolition materials at approved facilities per local regulations. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →