Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of New Orleans
Crossing signal replacement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Metro Water Reclamation Of Greater Chicago
Perform specialty inspections, troubleshooting, repairs, maintenance, replacement, improvements, and commissioning work as required on all railroad grade crossings and grade crossing signal systems on District railroads on both a scheduled, and as-needed basis, over a thirty-six (36) month period.
Posted Date
Oct 29, 2025
Due Date
Nov 18, 2025
Release: Oct 29, 2025
Metro Water Reclamation Of Greater Chicago
Close: Nov 18, 2025
Perform specialty inspections, troubleshooting, repairs, maintenance, replacement, improvements, and commissioning work as required on all railroad grade crossings and grade crossing signal systems on District railroads on both a scheduled, and as-needed basis, over a thirty-six (36) month period.
City of Richmond
Accepting bids from qualified traffic signal contractors to provide on-call services for replacing traffic signal poles.
Posted Date
Oct 21, 2025
Due Date
Nov 17, 2025
Release: Oct 21, 2025
City of Richmond
Close: Nov 17, 2025
Accepting bids from qualified traffic signal contractors to provide on-call services for replacing traffic signal poles.
Minnesota Department of Transportation
Signal replacement, ADA, drainage and TMS.
Posted Date
Nov 5, 2025
Due Date
Dec 3, 2025
Release: Nov 5, 2025
Minnesota Department of Transportation
Close: Dec 3, 2025
Signal replacement, ADA, drainage and TMS.
AvailableFallbrook Public Utility District
Work generally consists of the installation of approx. 300 LF of 24" HDPE dr 17 gravity sewer main and associated isolation valves and appurtenances, pipe supports, and demolition of existing ductile iron pipe. Installation of approx. 11'x15', 2'deep concrete valve vault, open top. And replacement of approx. 90 LF of 14" PVC gravity sewer main.
Posted Date
Oct 28, 2025
Due Date
Nov 20, 2025
Release: Oct 28, 2025
Fallbrook Public Utility District
Close: Nov 20, 2025
Work generally consists of the installation of approx. 300 LF of 24" HDPE dr 17 gravity sewer main and associated isolation valves and appurtenances, pipe supports, and demolition of existing ductile iron pipe. Installation of approx. 11'x15', 2'deep concrete valve vault, open top. And replacement of approx. 90 LF of 14" PVC gravity sewer main.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis