Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 53 CY unclassified excavation; 90 SY seeding; 5,300 LB reinforcing steel; 9 CY structural concrete. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Alhambra invites sealed bids for the Storm Drain Rehabilitation Project on Carlos Street to repair an 18-inch diameter storm drain approximately 300 feet in length. Bids are due January 8, 2026; they must be submitted to the City Clerk at 111 South First Street, Alhambra, CA by 10:30 A.M. and will be publicly opened at 11:00 A.M. The project requires compliance with prevailing wage and apprenticeship standards, a bid bond of at least 10%, and appropriate California contractor licensing (Class A, C-34, or C-42).
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
The City of Alhambra invites sealed bids for the Storm Drain Rehabilitation Project on Carlos Street to repair an 18-inch diameter storm drain approximately 300 feet in length. Bids are due January 8, 2026; they must be submitted to the City Clerk at 111 South First Street, Alhambra, CA by 10:30 A.M. and will be publicly opened at 11:00 A.M. The project requires compliance with prevailing wage and apprenticeship standards, a bid bond of at least 10%, and appropriate California contractor licensing (Class A, C-34, or C-42).
Premium
Access the largest public sector contact database
The City of Alhambra invites sealed bids for the Storm Drain Rehabilitation Project on Carlos Street to repair an 18-inch diameter storm drain approximately 300 feet in length. Bids are due January 8, 2026; they must be submitted to the City Clerk at 111 South First Street, Alhambra, CA by 10:30 A.M. and will be publicly opened at 11:00 A.M. The project requires compliance with prevailing wage and apprenticeship standards, a bid bond of at least 10%, and appropriate California contractor licensing (Class A, C-34, or C-42).
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
The City of Alhambra invites sealed bids for the Storm Drain Rehabilitation Project on Carlos Street to repair an 18-inch diameter storm drain approximately 300 feet in length. Bids are due January 8, 2026; they must be submitted to the City Clerk at 111 South First Street, Alhambra, CA by 10:30 A.M. and will be publicly opened at 11:00 A.M. The project requires compliance with prevailing wage and apprenticeship standards, a bid bond of at least 10%, and appropriate California contractor licensing (Class A, C-34, or C-42).
AvailableThe objective of this project is to develop a guide for state DOTs for evaluating when to either replace or rehabilitate culverts and storm drains. The guide will also assist designers in the selection of the most appropriate rehabilitation method(s) along with the applicable loading conditions and design method to use when applying the chosen method.
Posted Date
Nov 4, 2025
Due Date
Jan 6, 2026
Release: Nov 4, 2025
Close: Jan 6, 2026
The objective of this project is to develop a guide for state DOTs for evaluating when to either replace or rehabilitate culverts and storm drains. The guide will also assist designers in the selection of the most appropriate rehabilitation method(s) along with the applicable loading conditions and design method to use when applying the chosen method.
AvailableAsphalt concrete and Portland Cement removal, construction, and repair. Concrete sidewalk removal and reconstruction, trenching, storm drain and catch basin construction, traffic control, and signing and striping.
Posted Date
Dec 25, 2025
Due Date
Jan 15, 2026
Release: Dec 25, 2025
Close: Jan 15, 2026
Asphalt concrete and Portland Cement removal, construction, and repair. Concrete sidewalk removal and reconstruction, trenching, storm drain and catch basin construction, traffic control, and signing and striping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis