Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for construction of a 200 GPM Pump Station, 700 ft of 8 inch Gravity Line, and approximately 3500 ft of 6 inch pressure line.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Sealed bids are being requested by the City of Saltillo for the Crestview Sewer Improvements project; bids are due at 2:00 p.m. on January 21, 2026. The work includes construction of a 200 GPM pump station, installation of 700 feet of 8-inch gravity line, and about 3,500 feet of 6-inch pressure line; bids will be for a single prime contract. Contract documents (drawings/specifications) are available for examination at Engineering Solutions, Inc. and can be purchased through their plan room.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sealed bids are being requested by the City of Saltillo for the Crestview Sewer Improvements project; bids are due at 2:00 p.m. on January 21, 2026. The work includes construction of a 200 GPM pump station, installation of 700 feet of 8-inch gravity line, and about 3,500 feet of 6-inch pressure line; bids will be for a single prime contract. Contract documents (drawings/specifications) are available for examination at Engineering Solutions, Inc. and can be purchased through their plan room.
This Request for Proposals (RFP) is for the North Street Sewer Improvements project, which includes installation of CIPP lining, manhole rehabilitation, and pump station removal. The solicitation is issued by the City of Brandon and is funded by a CDBG-PF GRANT. Bids are due by January 26, 2026, and full solicitation documents are available on the Central Bidding platform, requiring registration for access.
Posted Date
Dec 22, 2025
Due Date
Jan 26, 2026
Release: Dec 22, 2025
Close: Jan 26, 2026
This Request for Proposals (RFP) is for the North Street Sewer Improvements project, which includes installation of CIPP lining, manhole rehabilitation, and pump station removal. The solicitation is issued by the City of Brandon and is funded by a CDBG-PF GRANT. Bids are due by January 26, 2026, and full solicitation documents are available on the Central Bidding platform, requiring registration for access.
AvailableStorm sewer and roadway improvements.
Posted Date
Dec 22, 2025
Due Date
Jan 15, 2026
Release: Dec 22, 2025
Close: Jan 15, 2026
Storm sewer and roadway improvements.
AvailablePoinsettia lane sewer improvements includes remove 2,560 feet of existing 12" diameter pvc sewer and replace with 910 feet of 15" diameter sewer and 1,650 feet of 18" pvc sewer; modification, rechanneling and rehabilitation of 10 existing sewer manhole structures; and all incidental work including, but not limited to, surveying services; utility potholing; groundwater dewatering and permitting; sewer by-pass systems; storm water and non-storm water pollution prevention; excavation support systems, including engineering services for deep excavations exceeding 20-feet in depth; traffic control; earthwork; paving and site restoration. Bressi sewer manhole rehabilitation includes rehabilitate 25 sewer manholes with epoxy-mortar lining inclusive of removing existing t-lock lining systems; interior surface preparation, smoothing, and cleaning; replacement of concrete benches and channels; removing, installing manhole concrete collars, frames and covers with adjustment to final grade; groundwater infiltration proofing by injection grouting; and all incidental work including, but not limited to, sewer by-pass systems and methods; and traffic control. Schedule also includes groundwater infiltration proofing by injection grouting at the poinsettia lift station flow meter vault.
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
Poinsettia lane sewer improvements includes remove 2,560 feet of existing 12" diameter pvc sewer and replace with 910 feet of 15" diameter sewer and 1,650 feet of 18" pvc sewer; modification, rechanneling and rehabilitation of 10 existing sewer manhole structures; and all incidental work including, but not limited to, surveying services; utility potholing; groundwater dewatering and permitting; sewer by-pass systems; storm water and non-storm water pollution prevention; excavation support systems, including engineering services for deep excavations exceeding 20-feet in depth; traffic control; earthwork; paving and site restoration. Bressi sewer manhole rehabilitation includes rehabilitate 25 sewer manholes with epoxy-mortar lining inclusive of removing existing t-lock lining systems; interior surface preparation, smoothing, and cleaning; replacement of concrete benches and channels; removing, installing manhole concrete collars, frames and covers with adjustment to final grade; groundwater infiltration proofing by injection grouting; and all incidental work including, but not limited to, sewer by-pass systems and methods; and traffic control. Schedule also includes groundwater infiltration proofing by injection grouting at the poinsettia lift station flow meter vault.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →