Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Craven County
Bid package (for labor/material/equipment/other) phase-1 will be abatement and demolition of the existing sudan shriners building (including select precast and brick salvage) to create space for phase-2, sitework, storm, asphalt parking, lighting & security as well as construction of a masonry replica of sudan shriners club entrance (in part utilizing salvaged materials). Bid packages include: bp0100: general trades, bp0205: demolition & abatement, bp0400: turnkey masonry, bp1010: signage, bp2600: electrical, bp3290: landscaping, bp3400: turnkey sitework.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Crystal Lake
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
Posted Date
Oct 13, 2025
Due Date
Dec 4, 2025
Release: Oct 13, 2025
City of Crystal Lake
Close: Dec 4, 2025
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
AvailableCity of Minneapolis
Seeks innovative and community-oriented developer(s) to redevelop phase 1 of the new nicollet/former kmart site.
Posted Date
Oct 6, 2025
Due Date
Jan 6, 2026
Release: Oct 6, 2025
City of Minneapolis
Close: Jan 6, 2026
Seeks innovative and community-oriented developer(s) to redevelop phase 1 of the new nicollet/former kmart site.
AvailableVillage of Carrier Mills
Purchase of one (1) new single phase 60kw generator which will operate on natural gas and one (1) new three phase 60kw generator which operate on propane gas.
Posted Date
Nov 12, 2025
Due Date
Dec 8, 2025
Release: Nov 12, 2025
Village of Carrier Mills
Close: Dec 8, 2025
Purchase of one (1) new single phase 60kw generator which will operate on natural gas and one (1) new three phase 60kw generator which operate on propane gas.
AvailableLaurel County
Renovation of the Existing Gymnasium and associated spaces. The main gymnasium will receive new windows, HVAC equipment, lighting and electrical fixtures, repaired flooring, and refreshed finishes. The existing stage area will be demolished and replaced with new floor structure at the same elevation as the main gymnasium. That space will then contain new restrooms, janitorial, and storage spaces. The space between in the existing stage opening will receive new infill framing and casework. The existing basement floor will be reworked to accommodate new footings and mechanical equipment. New double doors and exterior access will be provided for this unoccupied space at the back of the gymnasium. Existing abandoned openings on the rear and side of the gymnasium will be infilled with matching stone finishes. All existing exterior walls associated with Phase 2 will be cleaned. A new canopy and ramp will be constructed at the existing exterior gymnasium door. A new decorative main entrance gate will be constructed at the southern entrance, and a non-decorative gate constructed at the southern entrance. Some selective ceiling demolition and replacement in the existing Phase 1 corridor to facilitate Domestic Water, Sprinkler, and Power services to be extended to Phase 2 will be required. This work will allow the campus to utilize this space in day-to-day instructional activities and preserve the historical space for the community.
Posted Date
-
Due Date
Nov 20, 2025
Release: -
Laurel County
Close: Nov 20, 2025
Renovation of the Existing Gymnasium and associated spaces. The main gymnasium will receive new windows, HVAC equipment, lighting and electrical fixtures, repaired flooring, and refreshed finishes. The existing stage area will be demolished and replaced with new floor structure at the same elevation as the main gymnasium. That space will then contain new restrooms, janitorial, and storage spaces. The space between in the existing stage opening will receive new infill framing and casework. The existing basement floor will be reworked to accommodate new footings and mechanical equipment. New double doors and exterior access will be provided for this unoccupied space at the back of the gymnasium. Existing abandoned openings on the rear and side of the gymnasium will be infilled with matching stone finishes. All existing exterior walls associated with Phase 2 will be cleaned. A new canopy and ramp will be constructed at the existing exterior gymnasium door. A new decorative main entrance gate will be constructed at the southern entrance, and a non-decorative gate constructed at the southern entrance. Some selective ceiling demolition and replacement in the existing Phase 1 corridor to facilitate Domestic Water, Sprinkler, and Power services to be extended to Phase 2 will be required. This work will allow the campus to utilize this space in day-to-day instructional activities and preserve the historical space for the community.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis