Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include painting.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The scope of work includes the complete demolition of the existing facility, including removal of the oil tanks and septic tank, as well as all associated site work and utility connections. Demolition activities and the connection to the town-owned sewer system. The project also includes construction of a new 6,000 SF facility, repaving of the parking areas, and backfilling of the site to create proper grades for ramps and access to the boat storage area. A gravel pathway to the lake is also included. The proposed building will be a slab-on-grade wood structure designed for year-round use. The conditioned portion of the building will include student and coach lounges, as well as restroom facilities. A new propane tank will also be required.
Posted Date
Dec 19, 2025
Due Date
Jan 22, 2026
Release: Dec 19, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of work includes the complete demolition of the existing facility, including removal of the oil tanks and septic tank, as well as all associated site work and utility connections. Demolition activities and the connection to the town-owned sewer system. The project also includes construction of a new 6,000 SF facility, repaving of the parking areas, and backfilling of the site to create proper grades for ramps and access to the boat storage area. A gravel pathway to the lake is also included. The proposed building will be a slab-on-grade wood structure designed for year-round use. The conditioned portion of the building will include student and coach lounges, as well as restroom facilities. A new propane tank will also be required.
AvailableGordon County Schools seeks a contractor to provide all labor, materials, and equipment for interior painting at Red Bud Elementary School buildings 2011 and 2030 in Calhoun, Georgia. The solicitation specifies interior painting work at an elementary school facility and is due on February 4, 2026. This is a construction services RFP and not a grant program; full specifications are available through the buyer’s procurement communication channels.
Posted Date
-
Due Date
Feb 4, 2026
Close: Feb 4, 2026
Gordon County Schools seeks a contractor to provide all labor, materials, and equipment for interior painting at Red Bud Elementary School buildings 2011 and 2030 in Calhoun, Georgia. The solicitation specifies interior painting work at an elementary school facility and is due on February 4, 2026. This is a construction services RFP and not a grant program; full specifications are available through the buyer’s procurement communication channels.
AvailableProvide painting services at district campuses and department buildings.
Posted Date
Dec 13, 2025
Due Date
Jan 13, 2026
Release: Dec 13, 2025
Close: Jan 13, 2026
Provide painting services at district campuses and department buildings.
AvailableInstalling large-scale murals on roadway surfaces that cover up to 25,000 SF, managing volunteers, preparing streets for the installation of murals, managing an inventory of paint, and effectively recruiting and training staff. The successful vendor will install large-scale murals painted directly onto roadway and sidewalk surfaces that include concrete and asphalt surfaces. These paintings typically range in size from 2,000 to 25,000 SF. The PBOT Street Painting Program includes Painted Street Plazas ("plazas") and residential street paintings. In addition to installation, these paintings require a company to do maintenance work that can include street cleaning, repainting large scale murals, and ongoing maintenance of the paintings. The vendor will also paint plaza furniture or other items within the plazas as needed.
Posted Date
Dec 3, 2025
Due Date
Jan 23, 2026
Release: Dec 3, 2025
Close: Jan 23, 2026
Installing large-scale murals on roadway surfaces that cover up to 25,000 SF, managing volunteers, preparing streets for the installation of murals, managing an inventory of paint, and effectively recruiting and training staff. The successful vendor will install large-scale murals painted directly onto roadway and sidewalk surfaces that include concrete and asphalt surfaces. These paintings typically range in size from 2,000 to 25,000 SF. The PBOT Street Painting Program includes Painted Street Plazas ("plazas") and residential street paintings. In addition to installation, these paintings require a company to do maintenance work that can include street cleaning, repainting large scale murals, and ongoing maintenance of the paintings. The vendor will also paint plaza furniture or other items within the plazas as needed.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →