Summary
Project includes the demolition of one and two story residential single-family structures and misc. Walls and foundations. A hazardous materials assessment has been completed for each structure, and some abatement will be required as part of the work. Some structures still have interior furnishings. Work will include all labor, materials, and permitting to install erosion and sediment control devices; remove of all vegetation from the site; cap and abandon water and sewer connections at the property line in accordance with city of port orchard standards; abandon private utility connections in accordance with respective utility provider standards; remove complete building structure including all pavement and structural foundations, hazardous materials abatement, and furnishings removal and disposal; grade the site using existing soils to match adjacent properties and safely convey water to the historic discharge location; and stabilize site soils using hydroseed.