CityCA
Jul 8, 2026
Closes
Aug 26, 2026
Fire Station No. 2 Reconstruction RFP
Work generally consists of demolition of the existing station, furnishing and installing a fully operational temporary living and operating quarters, and construction of the new leed gold station. Work includes demolition (as applicable) erosion control; drill piers caps & beams slab on grade cooling tower basin misc bldg conc floor sealer rebar matl rebar labor lt. Wt. Insul fill - materials; masonry brickwork - labor brickwork - matls concrete masonry - labor concrete masonry - materials str. Glazed tile-labor str. Glazed tile-materials submittals/closeout documents supervision clean-up. See outside link.