Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct a PFAS treatment facility at its Country Place Well includes Construction of a granular activated carbon (GAC) facility designed to remove per and polyfluoroalkyl Substances (PFAS) from a potable ground water source, Installation of four (4) GAC vessels and GAC media, pre-purchased with the contracts assigned to the contractor, Construction of reinforced concrete backwash tank and recycle pump station, Construction of yard piping, Installation of District furnished chemical feed systems, Installation of instrumentation using the District selected instrumentation integrator S&B, Construction of in-ground infrastructure including water mains, manholes and vaults, seismic adaptors, primary and control electrical conduit and wiring, Construction of a stormwater infiltration system, Site preparation including tree removal, grading, excavation, fence installation, landscaping, and miscellaneous improvements, Modifications to the existing water treatment building.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of a PFAS treatment facility designed to remove per and polyfluoroalkyl Substances (PFAS) from a potable groundwater source.
Posted Date
-
Due Date
Feb 12, 2026
Close: Feb 12, 2026
Construction of a PFAS treatment facility designed to remove per and polyfluoroalkyl Substances (PFAS) from a potable groundwater source.
AvailableBrook acres wellfield PFAS treatment. The project includes constructing a 18' x 36' treatment facility to provide improved treatment for PFAS removal. The project will include constructing an above-ground facility inclusive of civil, mechanical, electrical, instrumentation, and site work.
Posted Date
Dec 15, 2025
Due Date
Feb 9, 2026
Release: Dec 15, 2025
Close: Feb 9, 2026
Brook acres wellfield PFAS treatment. The project includes constructing a 18' x 36' treatment facility to provide improved treatment for PFAS removal. The project will include constructing an above-ground facility inclusive of civil, mechanical, electrical, instrumentation, and site work.
AvailableThis solicitation seeks bids to construct a PFAS treatment facility at the Tyngsborough wellfield to address PFAS contamination; documents and plan sets are available through the Tighe & Bond bidding portal (registration required). Bids are due February 19, 2026, with trade/sub-bids due February 5, 2026, and a non-mandatory pre-bid conference held January 21, 2026. The posting is published on Tighe & Bond's bidding site on behalf of the Town of Tyngsborough and is funded via the DWSRF program (not a grant).
Posted Date
Jan 9, 2026
Due Date
Feb 19, 2026
Release: Jan 9, 2026
Close: Feb 19, 2026
This solicitation seeks bids to construct a PFAS treatment facility at the Tyngsborough wellfield to address PFAS contamination; documents and plan sets are available through the Tighe & Bond bidding portal (registration required). Bids are due February 19, 2026, with trade/sub-bids due February 5, 2026, and a non-mandatory pre-bid conference held January 21, 2026. The posting is published on Tighe & Bond's bidding site on behalf of the Town of Tyngsborough and is funded via the DWSRF program (not a grant).
Contract No. 1 - Wellhead 9 PFAS treatment facility The Project is comprised of two (2) primary components as follows: PFAS Facility: Work generally includes construction of a new 27-foot by 36-foot treatment facility housing two 12-ft diameter, 40,000-pound GAC vessels for the removal of PFAS. The proposed equipment would be fully housed within a new modular building. The building housing the GAC vessels will be located adjacent to the existing Well 9 building. The building will be wood framing studs with fiber cement lap siding provided by a pre-engineered manufacturer. Interior process piping shall consist of ductile iron and PVC and ranges in size from 2" to 12", including butterfly valves with both manual and electric actuators. Site Work: Work shall also include construction required outside of the physical building structure or facility including but not limited to raw water influent lines, finished water effluent piping, other site utilities, site grading, new sanitary manhole, site driveways, curb and gutter replacement, and paving, additional site electrical components, and landscape improvements associated with the project.
Posted Date
Jan 7, 2026
Due Date
Feb 10, 2026
Release: Jan 7, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 10, 2026
Contract No. 1 - Wellhead 9 PFAS treatment facility The Project is comprised of two (2) primary components as follows: PFAS Facility: Work generally includes construction of a new 27-foot by 36-foot treatment facility housing two 12-ft diameter, 40,000-pound GAC vessels for the removal of PFAS. The proposed equipment would be fully housed within a new modular building. The building housing the GAC vessels will be located adjacent to the existing Well 9 building. The building will be wood framing studs with fiber cement lap siding provided by a pre-engineered manufacturer. Interior process piping shall consist of ductile iron and PVC and ranges in size from 2" to 12", including butterfly valves with both manual and electric actuators. Site Work: Work shall also include construction required outside of the physical building structure or facility including but not limited to raw water influent lines, finished water effluent piping, other site utilities, site grading, new sanitary manhole, site driveways, curb and gutter replacement, and paving, additional site electrical components, and landscape improvements associated with the project.
Available