CityIA
Jul 30, 2026
Closes
Aug 19, 2026
Modern Woodmen Park Levee Repairs Project
The proposed improvements include, but are not limited to railing removal and reinstallation, retaining wall removal and construction, slope protection, erosion control, temporary fencing, chain link fencing, structural concrete, PCC Pavement, drain tiling and other appurtenant items needed to repair and maintain existing facilities in these designated areas. 67 CY topsoil, furnish and spread; 500 CY excavation and backfill; 100 CY cast in place concrete wall. See attached file.