CityFL
Mar 20, 2026
Closes
Sep 9, 2026
Fire Station #3 Project (Request for Proposal)
Work inlcudes construction of fire station no. 3.
Description: Corn city RFD fire station project.
SpecialDistrict · OH, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityFL
Mar 20, 2026
Closes
Sep 9, 2026
Work inlcudes construction of fire station no. 3.
CityFL
Mar 20, 2026
Closes
Sep 9, 2026
Work inlcudes construction of fire station no. 3.
CityCA
Aug 5, 2026
Closes
Sep 23, 2026
The City of Costa Mesa's Public Services department posted the opportunity as a lump-sum construction bid, not a grant. The work consists of demolishing the existing station, installing fully operational temporary living and operating quarters, and constructing a new LEED Gold station. The posting shows 08/05/2026 2:53 PM (PDT) as the posting date and 09/23/2026 2:00 PM (PDT) as the bid deadline, with electronic plans, specifications, and bid documents available.
CityIL
Aug 24, 2026
Closes
Sep 9, 2026
work generally consists of the replacement of the existing HVAC systems at Fire Station #2, including garage unit heater replacement, boiler replacement, baseboard zones, and AHU and air conditioner replacement, along with associated piping, ductwork, electrical work, equipment removal, system start-up and testing, and all incidental work, as detailed in the scope of work for the “Village of Matteson, Fire Station #2 HVAC Replacement Project.”