Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of existing Bridge No. 0360032 and previous abutments with a new structure along similar alignment: 50’ long x 24.5’ wide single span, consisting of five(5) W30x90 steel girders with corrugated metal decking for 8.5” thick slab, on a 0 degree skew, 0% grade, supported by elongated concrete abutment walls with straight wings encasing HP10x42 steel driven piling, located on Billingsville Road (aggregate) over Anderson Branch. A temporary stream crossing is required for quarry and local traffic. This is a Soft-Match Credit Bridge project. Lat/Long: 38.9155°, -92.7520°.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of existing Bridge No. 0360032 with a new 50' long x 24.5' wide single-span structure.
Posted Date
-
Due Date
Feb 9, 2026
Close: Feb 9, 2026
Replacement of existing Bridge No. 0360032 with a new 50' long x 24.5' wide single-span structure.
AvailableThe project includes the full replacement of bridge and all related work.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
The project includes the full replacement of bridge and all related work.
Release: Jan 17, 2026
Close: Feb 17, 2026
Work includes bridge replacement.
AvailableProcurement for the replacement of the Sodom-Ballou Road North Bridge No. 01.82.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
Procurement for the replacement of the Sodom-Ballou Road North Bridge No. 01.82.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →