Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of existing Bridge No. 0360032 with a new 50' long x 24.5' wide single-span structure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement of existing Bridge No. 0360032 and previous abutments with a new structure along similar alignment: 50’ long x 24.5’ wide single span, consisting of five(5) W30x90 steel girders with corrugated metal decking for 8.5” thick slab, on a 0 degree skew, 0% grade, supported by elongated concrete abutment walls with straight wings encasing HP10x42 steel driven piling, located on Billingsville Road (aggregate) over Anderson Branch. A temporary stream crossing is required for quarry and local traffic. This is a Soft-Match Credit Bridge project. Lat/Long: 38.9155°, -92.7520°.
Posted Date
Jan 19, 2026
Due Date
Feb 9, 2026
Release: Jan 19, 2026
Close:
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of existing Bridge No. 0360032 and previous abutments with a new structure along similar alignment: 50’ long x 24.5’ wide single span, consisting of five(5) W30x90 steel girders with corrugated metal decking for 8.5” thick slab, on a 0 degree skew, 0% grade, supported by elongated concrete abutment walls with straight wings encasing HP10x42 steel driven piling, located on Billingsville Road (aggregate) over Anderson Branch. A temporary stream crossing is required for quarry and local traffic. This is a Soft-Match Credit Bridge project. Lat/Long: 38.9155°, -92.7520°.
AvailableThe project includes the full replacement of bridge and all related work.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
The project includes the full replacement of bridge and all related work.
Release: Jan 17, 2026
Close: Feb 17, 2026
Work includes bridge replacement.
AvailableProcurement for the replacement of the Sodom-Ballou Road North Bridge No. 01.82.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
Procurement for the replacement of the Sodom-Ballou Road North Bridge No. 01.82.