Retrieving RFP details
Release
Close
Palm Beach County
To furnish all material, labor, supervision, permits and supplies necessary and reasonably incidental to replacing existing 8 and 10 cooling tower and bridge bypass water piping per the project requirements.
Convention Center - Cooling Tower Water Line Replacement - *RE-BID*
zip
Palm Beach County
The Work consists of replace existing 8" and 10" cooling tower and bridge bypass water piping.
Saint Clair County Housing Authority
Replacement of 86 dwelling unit heat pump and water heaters including thermostats, ductwork, gypsum board, metal furring enclosures, soffits and accessories. Also inclues replacement of existing rooftop cooling tower unit.
Illinois Office of the Secretary of State
replacement of the plastic fill for the cooling tower. The fill in the cooling tower is plastic and has deteriorated over time to the point where some or all the fill must be replaced.
Release
Jun 09, 2025
Close
Nov 06, 2025