Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of a licensed General Contractor for Phase I improvements including site work, foundation and pavilion construction, restroom installation, and utility connections at 4 Richmond Townhouse Road.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Board of County Commissioners, Orange County, Florida, is soliciting proposals for Design and Engineering Services for the I-4 / Sand Lake Road Interchange Gateway Improvements. This contract aims to enhance the interchange's functionality and aesthetics, aligning with the county's mission to improve transportation infrastructure. The project involves comprehensive design and engineering services, including landscape plans, roadway design, construction plans, public involvement activities, and coordination with FDOT.
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Board of County Commissioners, Orange County, Florida, is soliciting proposals for Design and Engineering Services for the I-4 / Sand Lake Road Interchange Gateway Improvements. This contract aims to enhance the interchange's functionality and aesthetics, aligning with the county's mission to improve transportation infrastructure. The project involves comprehensive design and engineering services, including landscape plans, roadway design, construction plans, public involvement activities, and coordination with FDOT.
AvailableThis RFP is for the installation of Brightleaf Boulevard and Narrows Road Sidewalk Improvements-Phase 2.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
This RFP is for the installation of Brightleaf Boulevard and Narrows Road Sidewalk Improvements-Phase 2.
AvailableProcurement for pavement mill and overlay, curb and gutter, storm sewer, sidewalk, entrances, retaining walls, guardrail, pavement marking, signing, and ADA improvements for West Watson Rd / Rott Rd from Weber Hill Road to Robyn Rd.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
Procurement for pavement mill and overlay, curb and gutter, storm sewer, sidewalk, entrances, retaining walls, guardrail, pavement marking, signing, and ADA improvements for West Watson Rd / Rott Rd from Weber Hill Road to Robyn Rd.
AvailableProject includes all materials, equipment, transportation and labor necessary to reconstruct Alice’s Road, from south of Dellwood Drive to south of Douglas Parkway, from a two-lane rural section to a four-lane boulevard section including PCC pavement, PCC trail and pedestrian ramps. Project items include subgrade preparation and treatment, PCC roadway paving, trail and ramp paving, pavement markings, storm sewer installation, water main installation, Joint Utility Trench (JUT) installation, traffic control, erosion control, landscaping, plantings, and surface restoration. Specific project location along with the kind and approximate quantity of materials to be used shall be as set forth in the Plans and Specifications.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
Project includes all materials, equipment, transportation and labor necessary to reconstruct Alice’s Road, from south of Dellwood Drive to south of Douglas Parkway, from a two-lane rural section to a four-lane boulevard section including PCC pavement, PCC trail and pedestrian ramps. Project items include subgrade preparation and treatment, PCC roadway paving, trail and ramp paving, pavement markings, storm sewer installation, water main installation, Joint Utility Trench (JUT) installation, traffic control, erosion control, landscaping, plantings, and surface restoration. Specific project location along with the kind and approximate quantity of materials to be used shall be as set forth in the Plans and Specifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →