Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Upgrades to building systems related to elevators, escalators, and elevator machine rooms at the World Trade Center, including structural, architectural, HVAC, fire protection, and electrical components.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes upgrades to building systems associated with elevators and escalators, including structural framing, guardrails, handrails, door seals, metal panels, glazing, waterproofing, signage, access hatches, ledge guards, fire-rated soffits and firestopping; marble flooring; HVAC ductwork, chilled water piping, fan coil unit, condensate and sump pumps, HVAC rebalancing; fire protection sprinklers and piping; light fixtures, smoke and heat detectors, and related work at public, tenant, and back-of-house areas
Posted Date
Apr 1, 2025
Due Date
Mar 4, 2026
Release: Apr 1, 2025
Close: Mar 4, 2026
Work includes upgrades to building systems associated with elevators and escalators, including structural framing, guardrails, handrails, door seals, metal panels, glazing, waterproofing, signage, access hatches, ledge guards, fire-rated soffits and firestopping; marble flooring; HVAC ductwork, chilled water piping, fan coil unit, condensate and sump pumps, HVAC rebalancing; fire protection sprinklers and piping; light fixtures, smoke and heat detectors, and related work at public, tenant, and back-of-house areas
AvailableBuilding elevator needs to be modernized. This elevator, along with the other three, needs a new maintenance service agreement, which is included in this bid solicitation. However, the maintenance for the orechio building elevator must also include an interim, pre-modernization maintenance period. The scope of the orechio building elevator modernization consists of replacing the following major items: - cab enclosure - car operating panel & controls - hydraulic pump unit including hydraulic cylinder & jack - traveling cables - related appurtenances the elevator contractor will be responsible to obtain permits and certification for operation, inspection, and testing. Additional items included in the scope of work: - demolition and disposal of existing materials not slated for reuse - all materials and components are to be supplied as part of the scope of supply and work - related electrical, plumbing, HVAC, lighting, fire alarm system coordination - machine room work.
Posted Date
Jan 25, 2026
Due Date
Mar 4, 2026
Release: Jan 25, 2026
Close: Mar 4, 2026
Building elevator needs to be modernized. This elevator, along with the other three, needs a new maintenance service agreement, which is included in this bid solicitation. However, the maintenance for the orechio building elevator must also include an interim, pre-modernization maintenance period. The scope of the orechio building elevator modernization consists of replacing the following major items: - cab enclosure - car operating panel & controls - hydraulic pump unit including hydraulic cylinder & jack - traveling cables - related appurtenances the elevator contractor will be responsible to obtain permits and certification for operation, inspection, and testing. Additional items included in the scope of work: - demolition and disposal of existing materials not slated for reuse - all materials and components are to be supplied as part of the scope of supply and work - related electrical, plumbing, HVAC, lighting, fire alarm system coordination - machine room work.
AvailableFurnish and replace air conditioners in elevator motor rooms.
Posted Date
Jan 27, 2026
Due Date
Feb 23, 2026
Release: Jan 27, 2026
Close: Feb 23, 2026
Furnish and replace air conditioners in elevator motor rooms.
AvailableElevator Trade work for the new Fire Station (Engine 5).
Posted Date
Jan 21, 2026
Due Date
Feb 6, 2026
Release: Jan 21, 2026
Close: Feb 6, 2026
Elevator Trade work for the new Fire Station (Engine 5).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →