Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work shall consist of construction of traffic signals. The aboveground signal equipment will be provided by the town. The existing curb ramps will be reconstructed including concrete curb and gutter, concrete sidewalk, and asphalt surface. Pavement marking and pavement marking removal are require.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Signalization of Intersection at Rowe Lane and Commons Parkway/Treyburn Lane
Posted Date
Nov 25, 2025
Due Date
Dec 30, 2025
Release: Nov 25, 2025
Close: Dec 30, 2025
Signalization of Intersection at Rowe Lane and Commons Parkway/Treyburn Lane
AvailablePremium
Access the largest public sector contact database
The reconstruction consist of approx 378 LF of Canterbury Drive at its intersection with U.S. Highway 71 and the replacement of an existing storm drain system 580 FT in length along Canterbury Drive from Rudy Road to Kingswood Drive. The items of work include 90 TONS of asphalt concrete overlay; 172 SY of 7" concrete paving; 186 LF of 24"x38" reinforced concrete elliptical storm drain; 423 LF of 3'-6" wide by 1'-6" deep concrete vertical wall channel; 222 LF of 14"x23" reinforced concrete elliptical storm drain, drainage inlets and headwalls, concrete driveway replacement, ditch regrading and other related items.
Posted Date
Nov 22, 2025
Due Date
Dec 17, 2025
Release: Nov 22, 2025
Close: Dec 17, 2025
The reconstruction consist of approx 378 LF of Canterbury Drive at its intersection with U.S. Highway 71 and the replacement of an existing storm drain system 580 FT in length along Canterbury Drive from Rudy Road to Kingswood Drive. The items of work include 90 TONS of asphalt concrete overlay; 172 SY of 7" concrete paving; 186 LF of 24"x38" reinforced concrete elliptical storm drain; 423 LF of 3'-6" wide by 1'-6" deep concrete vertical wall channel; 222 LF of 14"x23" reinforced concrete elliptical storm drain, drainage inlets and headwalls, concrete driveway replacement, ditch regrading and other related items.
AvailableThis RFP is for the replacement of the existing traffic signal cabinet and controller at the intersection of Piedmont Drive and Lowes Drive.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
This RFP is for the replacement of the existing traffic signal cabinet and controller at the intersection of Piedmont Drive and Lowes Drive.
AvailableWork include drive rehabilitation.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Close: Dec 18, 2025
Work include drive rehabilitation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis