Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the replacement of the existing traffic signal cabinet and controller at the intersection of Piedmont Drive and Lowes Drive.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replace the existing traffic signal cabinet and controller at the intersection. The scope includes, but is not limited to: Removal and proper disposal of the existing traffic signal cabinet, controller, conflict monitor, and related equipment. Furnishing and installing a new traffic signal cabinet, controller unit, conflict monitor, cabinet wiring, and associated hardware in accordance with VDOT Road and Bridge Standards and Specifications. Installation and/or replacement of conduit, pull boxes, and conductor as required for complete system operation. Connection, splicing, and labeling of all wiring to ensure proper integration with existing signal equipment. Testing, programming, and system turn-on to ensure proper operation of the new cabinet and controller.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Close:
Premium
Access the largest public sector contact database
Replace the existing traffic signal cabinet and controller at the intersection. The scope includes, but is not limited to: Removal and proper disposal of the existing traffic signal cabinet, controller, conflict monitor, and related equipment. Furnishing and installing a new traffic signal cabinet, controller unit, conflict monitor, cabinet wiring, and associated hardware in accordance with VDOT Road and Bridge Standards and Specifications. Installation and/or replacement of conduit, pull boxes, and conductor as required for complete system operation. Connection, splicing, and labeling of all wiring to ensure proper integration with existing signal equipment. Testing, programming, and system turn-on to ensure proper operation of the new cabinet and controller.
AvailableProcurement for the installation of a new, fully operational traffic signal system at the intersection of Riverside Drive and Barrett Street.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Procurement for the installation of a new, fully operational traffic signal system at the intersection of Riverside Drive and Barrett Street.
AvailableRemoving and replacing a damaged traffic signal pole. This project includes the following: The work consists of removing and replacing a damaged traffic signal pole at the intersection of Drive. The existing signal mast arm, signal heads, detection camera, preemption, streetlight arms and fixtures, signs and foundation will be reused. No onsite work to remove any of the components shall commence until the new traffic signal pole has been delivered. Setup proper, previously approved, traffic control to establish work area. Provide and maintain traffic control per the Virginia Work Area Protection Manual during all work activities. Carefully remove the existing mast arm, signal heads, detection camera, preemption, attached signage, streetlight arms and luminaires, and all associated wiring. Remove and dispose of the damaged traffic signal pole. Inspect and clean the existing foundation. Install the new traffic signal pole of the same height, finish (black powder-coated steel), and base-plate configuration to match the existing mast arm and foundation. Reinstall the existing mast arm, signal heads, detection camera, preemption, signage, streetlight arms and luminaires, on the new pole. New wiring shall be used from the signal pole terminal block to all equipment on the pole/mast arm. Reconnect all wiring or grounding as needed to ensure proper electrical operation for both the traffic signal and streetlight. Test and aim all signal heads and the streetlight to ensure correct operation and illumination pattern. Coordinate with City traffic signal staff for power shutdown and reactivation. Provide all labor, equipment, materials, and incidental items necessary for a complete and operational installation.
Posted Date
Nov 17, 2025
Due Date
Jan 6, 2026
Release: Nov 17, 2025
Close: Jan 6, 2026
Removing and replacing a damaged traffic signal pole. This project includes the following: The work consists of removing and replacing a damaged traffic signal pole at the intersection of Drive. The existing signal mast arm, signal heads, detection camera, preemption, streetlight arms and fixtures, signs and foundation will be reused. No onsite work to remove any of the components shall commence until the new traffic signal pole has been delivered. Setup proper, previously approved, traffic control to establish work area. Provide and maintain traffic control per the Virginia Work Area Protection Manual during all work activities. Carefully remove the existing mast arm, signal heads, detection camera, preemption, attached signage, streetlight arms and luminaires, and all associated wiring. Remove and dispose of the damaged traffic signal pole. Inspect and clean the existing foundation. Install the new traffic signal pole of the same height, finish (black powder-coated steel), and base-plate configuration to match the existing mast arm and foundation. Reinstall the existing mast arm, signal heads, detection camera, preemption, signage, streetlight arms and luminaires, on the new pole. New wiring shall be used from the signal pole terminal block to all equipment on the pole/mast arm. Reconnect all wiring or grounding as needed to ensure proper electrical operation for both the traffic signal and streetlight. Test and aim all signal heads and the streetlight to ensure correct operation and illumination pattern. Coordinate with City traffic signal staff for power shutdown and reactivation. Provide all labor, equipment, materials, and incidental items necessary for a complete and operational installation.
AvailableRemoving and replacing a damaged traffic signal pole. This project includes the following: The work consists of removing and replacing a damaged traffic signal pole at the intersection of Drive. The existing signal mast arm, signal heads, detection camera, preemption, streetlight arms and fixtures, signs and foundation will be reused. No onsite work to remove any of the components shall commence until the new traffic signal pole has been delivered. Setup proper, previously approved, traffic control to establish work area. Provide and maintain traffic control per the Virginia Work Area Protection Manual during all work activities. Carefully remove the existing mast arm, signal heads, detection camera, preemption, attached signage, streetlight arms and luminaires, and all associated wiring. Remove and dispose of the damaged traffic signal pole. Inspect and clean the existing foundation. Install the new traffic signal pole of the same height, finish (black powder-coated steel), and base-plate configuration to match the existing mast arm and foundation. Reinstall the existing mast arm, signal heads, detection camera, preemption, signage, streetlight arms and luminaires, on the new pole. New wiring shall be used from the signal pole terminal block to all equipment on the pole/mast arm. Reconnect all wiring or grounding as needed to ensure proper electrical operation for both the traffic signal and streetlight. Test and aim all signal heads and the streetlight to ensure correct operation and illumination pattern. Coordinate with City traffic signal staff for power shutdown and reactivation. Provide all labor, equipment, materials, and incidental items necessary for a complete and operational installation.
Posted Date
Nov 17, 2025
Due Date
Jan 6, 2026
Release: Nov 17, 2025
Close: Jan 6, 2026
Removing and replacing a damaged traffic signal pole. This project includes the following: The work consists of removing and replacing a damaged traffic signal pole at the intersection of Drive. The existing signal mast arm, signal heads, detection camera, preemption, streetlight arms and fixtures, signs and foundation will be reused. No onsite work to remove any of the components shall commence until the new traffic signal pole has been delivered. Setup proper, previously approved, traffic control to establish work area. Provide and maintain traffic control per the Virginia Work Area Protection Manual during all work activities. Carefully remove the existing mast arm, signal heads, detection camera, preemption, attached signage, streetlight arms and luminaires, and all associated wiring. Remove and dispose of the damaged traffic signal pole. Inspect and clean the existing foundation. Install the new traffic signal pole of the same height, finish (black powder-coated steel), and base-plate configuration to match the existing mast arm and foundation. Reinstall the existing mast arm, signal heads, detection camera, preemption, signage, streetlight arms and luminaires, on the new pole. New wiring shall be used from the signal pole terminal block to all equipment on the pole/mast arm. Reconnect all wiring or grounding as needed to ensure proper electrical operation for both the traffic signal and streetlight. Test and aim all signal heads and the streetlight to ensure correct operation and illumination pattern. Coordinate with City traffic signal staff for power shutdown and reactivation. Provide all labor, equipment, materials, and incidental items necessary for a complete and operational installation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis