Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for the installation of a new, fully operational traffic signal system at the intersection of Riverside Drive and Barrett Street.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
To install a new, fully operational, traffic signal system at the intersection. The scope includes, but is not limited to: Removal and/or modification of existing signing and striping as required. Installation of new traffic signal poles, mast arms, foundations, and anchor bolts in accordance with VDOT Road and Bridge Standards and Specifications. Installation of signal heads and associated hardware. Installation of new controller cabinet, controller unit, conflict monitor, cabinet wiring, and communications equipment. Trenching, directional boring, conduit, pull boxes, wiring, grounding, and connections necessary for complete system operation.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
Close: Dec 17, 2025
Premium
Access the largest public sector contact database
To install a new, fully operational, traffic signal system at the intersection. The scope includes, but is not limited to: Removal and/or modification of existing signing and striping as required. Installation of new traffic signal poles, mast arms, foundations, and anchor bolts in accordance with VDOT Road and Bridge Standards and Specifications. Installation of signal heads and associated hardware. Installation of new controller cabinet, controller unit, conflict monitor, cabinet wiring, and communications equipment. Trenching, directional boring, conduit, pull boxes, wiring, grounding, and connections necessary for complete system operation.
AvailableThis RFP is for the replacement of the existing traffic signal cabinet and controller at the intersection of Piedmont Drive and Lowes Drive.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
This RFP is for the replacement of the existing traffic signal cabinet and controller at the intersection of Piedmont Drive and Lowes Drive.
AvailableThis project involves the replacement of the existing traffic signal system with a new, fully operational traffic signal system at the intersection of Central Boulevard and Broad Street, including removal, installation of new poles, signal heads, controller cabinet, wiring, and restoration of disturbed areas.
Posted Date
Nov 25, 2025
Due Date
Dec 19, 2025
Release: Nov 25, 2025
Close: Dec 19, 2025
This project involves the replacement of the existing traffic signal system with a new, fully operational traffic signal system at the intersection of Central Boulevard and Broad Street, including removal, installation of new poles, signal heads, controller cabinet, wiring, and restoration of disturbed areas.
AvailableReplace the existing traffic signal cabinet and controller at the intersection. The scope includes, but is not limited to: Removal and proper disposal of the existing traffic signal cabinet, controller, conflict monitor, and related equipment. Furnishing and installing a new traffic signal cabinet, controller unit, conflict monitor, cabinet wiring, and associated hardware in accordance with VDOT Road and Bridge Standards and Specifications. Installation and/or replacement of conduit, pull boxes, and conductor as required for complete system operation. Connection, splicing, and labeling of all wiring to ensure proper integration with existing signal equipment. Testing, programming, and system turn-on to ensure proper operation of the new cabinet and controller.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Close: Dec 18, 2025
Replace the existing traffic signal cabinet and controller at the intersection. The scope includes, but is not limited to: Removal and proper disposal of the existing traffic signal cabinet, controller, conflict monitor, and related equipment. Furnishing and installing a new traffic signal cabinet, controller unit, conflict monitor, cabinet wiring, and associated hardware in accordance with VDOT Road and Bridge Standards and Specifications. Installation and/or replacement of conduit, pull boxes, and conductor as required for complete system operation. Connection, splicing, and labeling of all wiring to ensure proper integration with existing signal equipment. Testing, programming, and system turn-on to ensure proper operation of the new cabinet and controller.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis