Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project involves the replacement of the existing traffic signal system with a new, fully operational traffic signal system at the intersection of Central Boulevard and Broad Street, including removal, installation of new poles, signal heads, controller cabinet, wiring, and restoration of disturbed areas.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Install remove the existing traffic signal system and install a new, fully operational, traffic signal system at the intersection of Route 86. The scope includes, but is not limited to: Removal and/or modification of existing signing and striping as required. Installation of new traffic signal poles, mast arms, foundations, and anchor bolts in accordance with VDOT Road and Bridge Standards and Specifications. Installation of signal heads and associated hardware. Installation of new controller cabinet, controller unit, conflict monitor, cabinet wiring, and communications equipment. Trenching, directional boring, conduit, pull boxes, wiring, grounding, and connections necessary for complete system operation. Coordination with utility companies for protection of facilities in conflict with the proposed work. Testing, inspection, and signal turn-on in compliance with VDOT requirements. Removal of the existing traffic signal system including traffic control cabinet. Restoration of all disturbed areas to pre-construction condition or better.
Posted Date
-
Due Date
Dec 19, 2025
Premium
Access the largest public sector contact database
Close: Dec 19, 2025
Install remove the existing traffic signal system and install a new, fully operational, traffic signal system at the intersection of Route 86. The scope includes, but is not limited to: Removal and/or modification of existing signing and striping as required. Installation of new traffic signal poles, mast arms, foundations, and anchor bolts in accordance with VDOT Road and Bridge Standards and Specifications. Installation of signal heads and associated hardware. Installation of new controller cabinet, controller unit, conflict monitor, cabinet wiring, and communications equipment. Trenching, directional boring, conduit, pull boxes, wiring, grounding, and connections necessary for complete system operation. Coordination with utility companies for protection of facilities in conflict with the proposed work. Testing, inspection, and signal turn-on in compliance with VDOT requirements. Removal of the existing traffic signal system including traffic control cabinet. Restoration of all disturbed areas to pre-construction condition or better.
AvailableInstall remove the existing traffic signal system and install a new, fully operational, traffic signal system at the intersection of Route 86. The scope includes, but is not limited to: Removal and/or modification of existing signing and striping as required. Installation of new traffic signal poles, mast arms, foundations, and anchor bolts in accordance with VDOT Road and Bridge Standards and Specifications. Installation of signal heads and associated hardware. Installation of new controller cabinet, controller unit, conflict monitor, cabinet wiring, and communications equipment. Trenching, directional boring, conduit, pull boxes, wiring, grounding, and connections necessary for complete system operation. Coordination with utility companies for protection of facilities in conflict with the proposed work. Testing, inspection, and signal turn-on in compliance with VDOT requirements. Removal of the existing traffic signal system including traffic control cabinet. Restoration of all disturbed areas to pre-construction condition or better.
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
Install remove the existing traffic signal system and install a new, fully operational, traffic signal system at the intersection of Route 86. The scope includes, but is not limited to: Removal and/or modification of existing signing and striping as required. Installation of new traffic signal poles, mast arms, foundations, and anchor bolts in accordance with VDOT Road and Bridge Standards and Specifications. Installation of signal heads and associated hardware. Installation of new controller cabinet, controller unit, conflict monitor, cabinet wiring, and communications equipment. Trenching, directional boring, conduit, pull boxes, wiring, grounding, and connections necessary for complete system operation. Coordination with utility companies for protection of facilities in conflict with the proposed work. Testing, inspection, and signal turn-on in compliance with VDOT requirements. Removal of the existing traffic signal system including traffic control cabinet. Restoration of all disturbed areas to pre-construction condition or better.
AvailableProcurement for the installation of a new, fully operational traffic signal system at the intersection of Riverside Drive and Barrett Street.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Procurement for the installation of a new, fully operational traffic signal system at the intersection of Riverside Drive and Barrett Street.
AvailableTo install a new, fully operational, traffic signal system at the intersection. The scope includes, but is not limited to: Removal and/or modification of existing signing and striping as required. Installation of new traffic signal poles, mast arms, foundations, and anchor bolts in accordance with VDOT Road and Bridge Standards and Specifications. Installation of signal heads and associated hardware. Installation of new controller cabinet, controller unit, conflict monitor, cabinet wiring, and communications equipment. Trenching, directional boring, conduit, pull boxes, wiring, grounding, and connections necessary for complete system operation.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
Close: Dec 17, 2025
To install a new, fully operational, traffic signal system at the intersection. The scope includes, but is not limited to: Removal and/or modification of existing signing and striping as required. Installation of new traffic signal poles, mast arms, foundations, and anchor bolts in accordance with VDOT Road and Bridge Standards and Specifications. Installation of signal heads and associated hardware. Installation of new controller cabinet, controller unit, conflict monitor, cabinet wiring, and communications equipment. Trenching, directional boring, conduit, pull boxes, wiring, grounding, and connections necessary for complete system operation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis