Summary
The reconstruction consist of approx 378 LF of Canterbury Drive at its intersection with U.S. Highway 71 and the replacement of an existing storm drain system 580 FT in length along Canterbury Drive from Rudy Road to Kingswood Drive. The items of work include 90 TONS of asphalt concrete overlay; 172 SY of 7" concrete paving; 186 LF of 24"x38" reinforced concrete elliptical storm drain; 423 LF of 3'-6" wide by 1'-6" deep concrete vertical wall channel; 222 LF of 14"x23" reinforced concrete elliptical storm drain, drainage inlets and headwalls, concrete driveway replacement, ditch regrading and other related items.