Retrieving RFP details
Release
Close
H B And T S Utility District
Work includes pumping station improvements.
ADV-FOR-BIDS-HBTS-C-225
Elizabethtown Area Regional Authority
Sewage pumping station upgrade: Expansion of the existing 250-gallon-per-minute (gpm) buried packaged pumping station to a 400-gpm submersible sewage pumping station, along with the installation of approx. 1,640 LF of 6" sewage force main in parallel with the existing 4" force main and installation of approx. 255 LF of 8-inch gravity sewer main. Work includes installation of an owner-procured package pump station and control system, a new channel grinder, an 8-foot by 8-foot precast wet well, temporary electrical connections, a new electrical service entrance, modifications to the existing generator building, precast manhole structures and yard piping, site paving, fencing, grading, demolition of all existing pumping station facilities, and maintenance of sanitary sewer flows throughout construction.
Chester Water Authority
Upgrade of potable water booster pumps, valves, controls, generator, interior piping, building improvements as well as site improvements to an existing booster pump station. Includes bypass pumping during the project.
Wisconsin Department of Administration
This project will repave portions of multiple roads and parking areas throughout Governor Dodge State Park. Repaving includes: Ridge Road from Twin Valley Road to Cox Hollow Road, Hickory Ridge Road and parking areas, Enee Point Parking Lot, and the Cox Hollow Boat Launch. This project will also replace aging and failing waterlines in the Twin Valley Campground, and construct a new parking area as part of this project at Smith Conley Creek, south of the park on CTH H.
Release
Oct 15, 2025
Close
Nov 18, 2025