City of Neenah
Construction of stormwater pond.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Neenah
Work includes pond excavating/grading; rock blasting; storm sewer.
Posted Date
Nov 7, 2025
Due Date
Nov 21, 2025
Release: Nov 7, 2025
City of Neenah
Close: Nov 21, 2025
Work includes pond excavating/grading; rock blasting; storm sewer.
AvailableCity of Dade City
The project involves the rejuvenation and consolidation of two existing stormwater ponds, including excavation, cleaning, regrading, landscaping, and fencing work to improve stormwater management, site safety, and aesthetics. The work shall include the following tasks: 1. Removal of existing berm. - Remove the existing berm-style wall separating the two stormwater ponds to allow consolidation into a single, larger pond. See attached file for full scope.
Posted Date
Oct 19, 2025
Due Date
Dec 4, 2025
Release: Oct 19, 2025
City of Dade City
Close: Dec 4, 2025
The project involves the rejuvenation and consolidation of two existing stormwater ponds, including excavation, cleaning, regrading, landscaping, and fencing work to improve stormwater management, site safety, and aesthetics. The work shall include the following tasks: 1. Removal of existing berm. - Remove the existing berm-style wall separating the two stormwater ponds to allow consolidation into a single, larger pond. See attached file for full scope.
AvailableCity of Lexington
The Woods Creek Stormwater BMP Pond which includes (all values are approximate) Stormwater management pond with approximately 100,000 CF of internal storage, 200 LF stormdrain, 5 stormdrain structures, tree removal, rock removal, landscaping, testing during construction, restoration, appurtenances, erosion and sediment control, material export; material import. Price shall encompass a complete project, per the plans and specifications, to include but not limited to, mobilization; permits; erosion & sediment control; demolition; trenching, sheeting, shoring and dewatering; bedding, pipe installation, backfill, and compaction; utility replacements, relocations, or temporary bracing and shoring; temporary patching and permanent pavement replacement; reestablishment of green areas and landscaping; and all elements necessary to complete the Work in a complete and first class manner.
Posted Date
-
Due Date
Jan 14, 2026
Release: -
City of Lexington
Close: Jan 14, 2026
The Woods Creek Stormwater BMP Pond which includes (all values are approximate) Stormwater management pond with approximately 100,000 CF of internal storage, 200 LF stormdrain, 5 stormdrain structures, tree removal, rock removal, landscaping, testing during construction, restoration, appurtenances, erosion and sediment control, material export; material import. Price shall encompass a complete project, per the plans and specifications, to include but not limited to, mobilization; permits; erosion & sediment control; demolition; trenching, sheeting, shoring and dewatering; bedding, pipe installation, backfill, and compaction; utility replacements, relocations, or temporary bracing and shoring; temporary patching and permanent pavement replacement; reestablishment of green areas and landscaping; and all elements necessary to complete the Work in a complete and first class manner.
AvailableTown of La Plata
The Town of La Plata, Maryland invites sealed responses from qualified contractors for the Redwood Lake Stormwater Management Pond Rehabilitation Project. This construction Request for Bid is listed as open and is scheduled to close on 2025-11-19 at 1:59 PM.
Posted Date
Oct 17, 2025
Due Date
Nov 19, 2025
Release: Oct 17, 2025
Town of La Plata
Close: Nov 19, 2025
The Town of La Plata, Maryland invites sealed responses from qualified contractors for the Redwood Lake Stormwater Management Pond Rehabilitation Project. This construction Request for Bid is listed as open and is scheduled to close on 2025-11-19 at 1:59 PM.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis