Regional Municipality of Durham
CountyON
Posted
Nov 5, 2026
Dec 1, 2026
Trunk sewer inspection program
Trunk sewer inspection program
Description: The Region will ONLY accept ELECTRONIC BID SUBMISSIONS submitted through the Region’s Bids and Tenders website for this Request for Proposals. HARD COPY BID SUBMISSIONS WILL NOT BE ACCEPTED. Bids must be submitted and received by the Region no later than 1:00:00 p.m., Eastern Standard Time. BRIEF DESCRIPTION OF WORK: This Request for Proposals (the “RFP”) is an invitation by The Regional Municipality of York (the “Region”) to prospective proponents to submit proposals for the Design, Contract Administration, and Site Inspection Services to be provided in relation to the Y1-A2 Leslie Street Trunk Sewer Expansion CMAR Project, as further described in Sections A and B of the RFP Particulars (Appendix A) (the “Deliverables”). This RFP seeks engineering services to complete the predesign (30% detailed design), detailed design (60%, 90% and 100% detailed design), construction administration and site inspection for the Leslie Street Trunk Sewer Y1‑A2, which consists of a new trunk sewer approximately 6.3 km in length and 3.0 m inner diameter (which will be confirmed during the design stage) along Leslie Street between St. John’s Sideroad and Bloomington Road. For complete bid details, refer to the RFP documents. QUESTIONS: Questions related to this RFP should be submitted to the Region through the Bidding Website by clicking on the 'Submit a Question' button. ACCOMMODATION REQUESTS: Accommodation requests under AODA should be directed to the Region's Procurement Representative via email to peter.hwang@york.ca
County · ON, CA
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Regional Municipality of York.
Adjacent opportunities open for bidding right now.
Regional Municipality of Durham
CountyON
Posted
Nov 5, 2026
Dec 1, 2026
Trunk sewer inspection program
CityTX
Posted
-
Nov 17, 2026
Worm consist of temporary bypass at southeast lift station, 9,490 lf of furnish and install temporary livestock control fencing, 1,660 lf of furnish & install 5' barbed wire fence, 249 lf of furnish & install 6' chain link fence, 1 ea of furnish & install barbed wire fence, remove and salvage items within existing lift station, decommision and abandon existing lift station wet well & valve vault, abandon existing 18" gravity main (cut & plug) & bypass connection, abandon existing 12" force main (cut & plug) & bypass connection, 18 sy of remove existing concrete pad, 4 ea of remove and salvage 12" valves, 1 ea of remove existing sanitary manhole. See attached file.
NYC Department of Design & Construction
State AgencyNY
Posted
Aug 5, 2026
Jul 31, 2030
The City of New York is seeking qualifications from firms for design and construction services related to the SE-885 Trunk Sewer and Outfall at Bergen Basin, including sewer mains, outfall structures, engineering, permitting, and coordination with existing infrastructure. Responses must be submitted through the PASSPort Public Portal using the PQL number PQL000172. This construction-related solicitation is open as of August 5, 2026, and responses are due by July 31, 2030 at 5:00 PM Eastern Time; it is not a grant program.
NYC Department of Design & Construction
State AgencyNY
Posted
Jul 10, 2026
Jul 31, 2030
The New York City Department of Design and Construction (DDC) issued RFQ SE-885 seeking qualified firms for design-and-construction services for the SE-885 Trunk Sewer and Outfall at Bergen Basin, part of the 150th Street Trunk Sewer that shares an outfall with the Guy R. Brewer Trunk Sewer. The work includes design, engineering, construction of trunk sewer lines and outfall structures, coordination with existing utilities and municipal agencies, permitting, and environmental compliance. Vendors must submit responses via the City of New York PASSPort portal where the full solicitation and submission instructions are posted.