Summary
The replacement of a bridge and approx. 1,000 LF of road construction. The construction of a new single span prestressed concrete bridge, 48' x 27'-2". Improvements consist of but are not limited to, substructure construction and superstructure construction. The superstructure consists of prestressed tri-deck concrete beams with guardrail. The beams will be founded on reinforced concrete caps (or concrete cap abutments) supported by driven steel pipe piles. The construction of the re-alignment of soap creek road. Improvements consist ofroad re-alignment construction, construction of road approaches, and removal and disposal of the existing bridge.