Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Penticton
The City of Penticton seeks proposals for the replacement of Penticton Pier, including removal of the existing pier, construction of a new pier, and installation of landscaping and lighting. Substantial performance is required by April 30, 2026.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Maryland Transportation Authority
Work involves removal of the existing North Pier and construction of a new Pier.
Posted Date
Oct 27, 2025
Due Date
Dec 17, 2025
Release: Oct 27, 2025
Maryland Transportation Authority
Close: Dec 17, 2025
Work involves removal of the existing North Pier and construction of a new Pier.
AvailableCity of Dunedin
Work includes the demolition and reconstruction of the fishing pier and associated facilities. Work will involve removing the existing pier, floating docks, gangways, rescue dock, boat lift, and related timber pilings. New construction will include a fishing pier, gangway, and floating dock system, rescue dock, and timber fender piles. Demolition of existing upland sidewalks and asphalt will also be performed as required to complete the seawall repairs. Upland site restoration will include new concrete sidewalks, curbing, landscape planters, and pavement. A new boat lift system provided by the owner, along with a new electrical panel and lighting, will be installed to complete the site improvements.
Posted Date
Oct 24, 2025
Due Date
Dec 2, 2025
Release: Oct 24, 2025
City of Dunedin
Close: Dec 2, 2025
Work includes the demolition and reconstruction of the fishing pier and associated facilities. Work will involve removing the existing pier, floating docks, gangways, rescue dock, boat lift, and related timber pilings. New construction will include a fishing pier, gangway, and floating dock system, rescue dock, and timber fender piles. Demolition of existing upland sidewalks and asphalt will also be performed as required to complete the seawall repairs. Upland site restoration will include new concrete sidewalks, curbing, landscape planters, and pavement. A new boat lift system provided by the owner, along with a new electrical panel and lighting, will be installed to complete the site improvements.
AvailableSan Diego Unified Port District
Pier inspections and maintenance services for all piers and docks.
Posted Date
Oct 29, 2025
Due Date
Dec 3, 2025
Release: Oct 29, 2025
San Diego Unified Port District
Close: Dec 3, 2025
Pier inspections and maintenance services for all piers and docks.
AvailableCity of Holly Hill
To remove and properly dispose of approximately 140 LF of damaged pier sections on piles and submerged in the Halifax River, receive, unload, assemble, and install prefabricated dock sections supplied by pier manufacturer onto the existing concrete pilings, including four (4) fixed piers measuring 8` x 30` each and one (1) fixed pier measuring 8` x 18`, with 2x6 Composite Timber Tech Vintage Decking, 42" Combination Rail system, and ten (10) 9` Header Kits. The Contractor shall shim existing composite decking boards on the remaining pier sections to ensure proper fit, remove and replace five (5) D-Series LED Bollard lights (lights to be provided by the City), including mounting, electrical connections, and testing to ensure full functionality.
Posted Date
Oct 27, 2025
Due Date
Dec 1, 2025
Release: Oct 27, 2025
City of Holly Hill
Close: Dec 1, 2025
To remove and properly dispose of approximately 140 LF of damaged pier sections on piles and submerged in the Halifax River, receive, unload, assemble, and install prefabricated dock sections supplied by pier manufacturer onto the existing concrete pilings, including four (4) fixed piers measuring 8` x 30` each and one (1) fixed pier measuring 8` x 18`, with 2x6 Composite Timber Tech Vintage Decking, 42" Combination Rail system, and ten (10) 9` Header Kits. The Contractor shall shim existing composite decking boards on the remaining pier sections to ensure proper fit, remove and replace five (5) D-Series LED Bollard lights (lights to be provided by the City), including mounting, electrical connections, and testing to ensure full functionality.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis