Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Augusta Unified School District 402
Construction of parking lots.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Northmor Local School District
Provide parking lots repair.
Posted Date
Nov 19, 2025
Due Date
Dec 8, 2025
Release: Nov 19, 2025
Northmor Local School District
Close: Dec 8, 2025
Provide parking lots repair.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
New York City Economic Development Corporation (NYCEDC)
Seeking professional parking facility operators to design, install, operate, manage and maintain parking lots and associated infrastructure and equipment.
Posted Date
Nov 14, 2025
Due Date
Dec 15, 2025
Release: Nov 14, 2025
New York City Economic Development Corporation (NYCEDC)
Close: Dec 15, 2025
Seeking professional parking facility operators to design, install, operate, manage and maintain parking lots and associated infrastructure and equipment.
AvailableHarris County-Houston Sports Authority
Construction of surface parking lots
Posted Date
Nov 12, 2025
Due Date
Dec 1, 2025
Release: Nov 12, 2025
Harris County-Houston Sports Authority
Close: Dec 1, 2025
Construction of surface parking lots
AvailableCity of Wichita
Streets and parking lots rehabilitation. 6550 lf sawcut; 250 lf fence removed; 655 sy remove and replace 8" concrete pavement; 872 sy remove ex concrete pavement; 515 sy remove ex asphalt pavement; 698 lf remove and replace curb & gutter; 223 lf remove curb & gutter; 9 lf remove flume; 156 lf remove trench drain; 1535 sf remove and replace sidewalk; 743 sf remove sidewalk; 3 lf remove retaining wall; 88 lf remove and replace perforated pipe drain; 3 each adjust mh/valve top; 1 each tree removal; 520 lf sleeves, 4" pvc; 90 lf sleeves, 6" pvc; 3288 sy 6" pcc pavement (fiber reinforced) (macro at 3lbs/sy); 2594 sy 6" crushed rock base; 4058 sy 6" reinforced crushed rock base; 765 sy overexcavation (6" excavation & replacement with 6" crushed rock base). See outside link.
Posted Date
Nov 11, 2025
Due Date
Dec 5, 2025
Release: Nov 11, 2025
City of Wichita
Close: Dec 5, 2025
Streets and parking lots rehabilitation. 6550 lf sawcut; 250 lf fence removed; 655 sy remove and replace 8" concrete pavement; 872 sy remove ex concrete pavement; 515 sy remove ex asphalt pavement; 698 lf remove and replace curb & gutter; 223 lf remove curb & gutter; 9 lf remove flume; 156 lf remove trench drain; 1535 sf remove and replace sidewalk; 743 sf remove sidewalk; 3 lf remove retaining wall; 88 lf remove and replace perforated pipe drain; 3 each adjust mh/valve top; 1 each tree removal; 520 lf sleeves, 4" pvc; 90 lf sleeves, 6" pvc; 3288 sy 6" pcc pavement (fiber reinforced) (macro at 3lbs/sy); 2594 sy 6" crushed rock base; 4058 sy 6" reinforced crushed rock base; 765 sy overexcavation (6" excavation & replacement with 6" crushed rock base). See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →