Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnish, install, and test outside plant fiber optic infrastructure for its broadband infrastructure deployment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Golden State Connect Authority (GSCA) is soliciting bids to design and construct Phase 1 of the Amador County outside plant (OSP) broadband fiber‑optic network, which includes extensive conduit and fiber installation, handholes, splice closures, and telecommunications huts at multiple locations. The project requires specialized contractor licensing (Class A, or C‑34 + C‑10), compliance with California prevailing wage and bonding/insurance requirements, and provides a construction schedule of 120 calendar days with liquidated damages for delays. Key procurement milestones include a mandatory pre‑bid meeting on 2026‑01‑07, questions due by 2026‑01‑21, answers by 2026‑01‑27, and bids due on 2026‑02‑06 via the buyer’s electronic procurement portal.
Posted Date
Dec 15, 2025
Due Date
Feb 6, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 6, 2026
The Golden State Connect Authority (GSCA) is soliciting bids to design and construct Phase 1 of the Amador County outside plant (OSP) broadband fiber‑optic network, which includes extensive conduit and fiber installation, handholes, splice closures, and telecommunications huts at multiple locations. The project requires specialized contractor licensing (Class A, or C‑34 + C‑10), compliance with California prevailing wage and bonding/insurance requirements, and provides a construction schedule of 120 calendar days with liquidated damages for delays. Key procurement milestones include a mandatory pre‑bid meeting on 2026‑01‑07, questions due by 2026‑01‑21, answers by 2026‑01‑27, and bids due on 2026‑02‑06 via the buyer’s electronic procurement portal.
AvailableWork consist of 209,946 LF of conduit system furnish and installation (mainline directional boring, termination trenching, and bridge crossing), 639 EA of handhole/vaults furnish and installation, 209,946 LF of trace wire furnish and installation, 282,791 LF of fiber optic cable furnish and installation into conduit system, 2,705 SF of surface restoration, hut system installation, 270 EA of splice closures/trays furnish and installation, 39 EA of termination panels and trays installation, 1,674 EA of fiber splices/terminations and testing.
Posted Date
Dec 12, 2025
Due Date
Feb 6, 2026
Release: Dec 12, 2025
Close: Feb 6, 2026
Work consist of 209,946 LF of conduit system furnish and installation (mainline directional boring, termination trenching, and bridge crossing), 639 EA of handhole/vaults furnish and installation, 209,946 LF of trace wire furnish and installation, 282,791 LF of fiber optic cable furnish and installation into conduit system, 2,705 SF of surface restoration, hut system installation, 270 EA of splice closures/trays furnish and installation, 39 EA of termination panels and trays installation, 1,674 EA of fiber splices/terminations and testing.
AvailableRelease: Jan 20, 2026
Close: Mar 3, 2026
To provide fiber optic network cabling.
AvailableProvide fiber optic materials related to the proposed Fiber to the Premises (FTTP) system.
Posted Date
Jan 9, 2026
Due Date
Feb 10, 2026
Release: Jan 9, 2026
Close: Feb 10, 2026
Provide fiber optic materials related to the proposed Fiber to the Premises (FTTP) system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →