Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Confederated Tribes of Siletz Indians
To provide all labor, materials, equipment, supervision, permits, traffic control, and related services necessary to complete road construction and roadway frontage improvements and stormwater infrastructure improvements along swan avenue and associated ctsi facilities in siletz, oregon. The intent of this project is to improve roadway safety, pedestrian accessibility, stormwater conveyance.
Posted Date
Jun 16, 2026
Due Date
Jul 17, 2026
Release: Jun 16, 2026
Confederated Tribes of Siletz Indians
Close: Jul 17, 2026
To provide all labor, materials, equipment, supervision, permits, traffic control, and related services necessary to complete road construction and roadway frontage improvements and stormwater infrastructure improvements along swan avenue and associated ctsi facilities in siletz, oregon. The intent of this project is to improve roadway safety, pedestrian accessibility, stormwater conveyance.
AvailableConfederated Tribes of Siletz Indians
For repaving, grading, and drainage improvements at the tribal transportation facility (bullpen site). This project is critical infrastructure supporting transportation operations, emergency response, and public works staging, and must meet high durability, safety, and resilience standards.
Posted Date
Jun 15, 2026
Due Date
Jul 17, 2026
Release: Jun 15, 2026
Confederated Tribes of Siletz Indians
Close: Jul 17, 2026
For repaving, grading, and drainage improvements at the tribal transportation facility (bullpen site). This project is critical infrastructure supporting transportation operations, emergency response, and public works staging, and must meet high durability, safety, and resilience standards.
AvailableConfederated Tribes of Siletz Indians
To provide turnkey design-build services for a regional electric vehicle (ev) charging network consisting of up to thirty-two (32) dc fast charging ports throughout lincoln county, oregon. The final configuration may consist of any combination of single-port and dual-port level 3 charging stations capable of serving public, tribal government, fleet, transit, and emergency response vehicles.
Posted Date
Jun 15, 2026
Due Date
Jul 15, 2026
Release: Jun 15, 2026
Confederated Tribes of Siletz Indians
Close: Jul 15, 2026
To provide turnkey design-build services for a regional electric vehicle (ev) charging network consisting of up to thirty-two (32) dc fast charging ports throughout lincoln county, oregon. The final configuration may consist of any combination of single-port and dual-port level 3 charging stations capable of serving public, tribal government, fleet, transit, and emergency response vehicles.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge