Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include construction of cell 6 includes the installation of a composite liner system, leachate collection and transmission system, stormwater management system, and landfill gas collection system. Additional construction of a 1-million gallon leachate storage tank and upgrades to the existing landfill gas flare and blowers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Scope of Service shall be based on Services of a Construction Manager at Risk.
Posted Date
May 23, 2025
Due Date
Feb 13, 2026
Release: May 23, 2025
Close: Feb 13, 2026
Scope of Service shall be based on Services of a Construction Manager at Risk.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of San José seeks bids for “10605 - On‑Call General Engineering Construction Contract 26‑29 – Re‑Bid,” a three‑year on‑call contract to provide as‑needed site and civil work for city‑owned facilities and trails. Proposals must be submitted via Biddingo and the contract value is estimated at $3,000,000. The solicitation opened on 12/17/2025 and closes on 01/29/2026 at 11:00 a.m. PT.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
The City of San José seeks bids for “10605 - On‑Call General Engineering Construction Contract 26‑29 – Re‑Bid,” a three‑year on‑call contract to provide as‑needed site and civil work for city‑owned facilities and trails. Proposals must be submitted via Biddingo and the contract value is estimated at $3,000,000. The solicitation opened on 12/17/2025 and closes on 01/29/2026 at 11:00 a.m. PT.
AvailableThe City of Columbus seeks a Construction Manager at Risk (CMaR) to deliver the Columbus Police Substation #6 (Easton). The CMaR will assist post-design with development of bid packages and GMP amendments following competitive bidding and will manage construction to meet schedule and budget. Proposals must be submitted electronically via the City’s Euna (Bonfire) portal; communication outside the portal and hard copy submissions are not accepted.
Posted Date
-
Due Date
Feb 17, 2026
Close: Feb 17, 2026
The City of Columbus seeks a Construction Manager at Risk (CMaR) to deliver the Columbus Police Substation #6 (Easton). The CMaR will assist post-design with development of bid packages and GMP amendments following competitive bidding and will manage construction to meet schedule and budget. Proposals must be submitted electronically via the City’s Euna (Bonfire) portal; communication outside the portal and hard copy submissions are not accepted.
AvailableConstruction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.
Posted Date
Nov 13, 2025
Due Date
Jan 29, 2026
Release: Nov 13, 2025
Close: Jan 29, 2026
Construction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →