Work includes excavation, select granular embankment (cv), embankment monitoring system, calcium chloride solution, aggregate base (cv) class 5 (p), type sp 12. 5 non wearing course mixture (3,b), type sp 12. 5 wearing course mixture (3,c), type s barrier concrete (3s52), structural concrete (3b52), reinforcement bars (epoxy coated), bridge slab concrete (3yhpc-m), structure excavation, bridge approach panels, remove existing bridge, structural backfill (mod), c-i-p concrete test pile 90 ft long 12", c-i-p concrete test pile 90 ft long 16", c-i-p concrete piling 12", c-i-p concrete piling 16", sheet piling, random riprap class iii, traffic barrier design transition type 31.