CountyMS
Posted
Nov 18, 2026
Dec 18, 2026
Construction of 0.161 Miles of Bridge & Approaches RFP
Work inlcudes 78 LF removal of pipe (all sizes); 606 CY unclassified excavation; 7,797 CY borrow excavation (fme) (contractor furnished) (class 9 ); 1 TN crushed stone, size 825 95; 72 LF 18" reinforced concrete pipe, class iii; 75 LF guard rail, "w" beam; 4 EA guard rail, bridge end section, thrie beam; 4 EA guard rail, terminal end section; 1 ls roadway construction surveying; 10 EA right-of-way markers (type ii ); 1 LF maintenance of traffic; 4 EA reflectorized traffic object marker (encapsulated lens) (type 3 ); 18 EA reflectorized traffic delineator sign (encapsulated lens).
