Special DistrictCT
Jun 20, 2026
Closes
Sep 18, 2026
Construction Manager at Risk RFP
Construction Manager at Risk for the Clock Factory Redevelopment.
Description: This RFP seeks Construction Manager at Risk (CMAR) Services for the construction of the New Precinct 4 Maintenance Center, which includes an Administration Building, Maintenance Building, Fleet Building, Covered Storage, Fuel Island, and Covered Parking Areas.
County · TX, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Special DistrictCT
Jun 20, 2026
Closes
Sep 18, 2026
Construction Manager at Risk for the Clock Factory Redevelopment.
CountyTX
Aug 4, 2026
Closes
Aug 26, 2026
Work includes concrete foundations, CMU walls, structural steel, waterproofing, metal panels, roofing, standard and detention glazing, plaster, drywall and ceiling systems , tile , flooring , painting , signage, specialties, metal casework, food service equipment, laundry equipment, fire sprinkler systems, plumbing, HVAC, electrical, fire alarm, earthwork, site concrete, fencing, earthwork and, site utilities
CityNJ
Jun 29, 2026
Closes
Aug 18, 2026
The City of Salem, Oregon is soliciting Request for Proposals No. 267068 from qualified Construction Manager at Risk (CMAR) firms for the Geren Island Flow Maintenance Project. The project involves channel restoration and management actions in the North Santiam River near Stayton, Oregon—including removal of accumulated bed material, installation of large wood structures, construction of a point bar and engineered riffles—to increase low summer flows to the City's Geren Island Water Treatment Facility intakes. Sealed proposals must be submitted electronically via Equity Hub's Bid Locker by 2:00 p.m. local time on August 18, 2026, with an optional pre-proposal conference and site tour scheduled for August 4, 2026.
Special DistrictFL
Jul 15, 2026
Closes
Sep 2, 2026
Tampa Bay Water is seeking proposals for Construction Manager at Risk (CMAR) services for the South Hillsborough Wellfield project located in Southern Hillsborough County, Florida. The project will tap into high-quality groundwater to supply 6-12 million gallons per day (mgd) of drinking water, with the wellfield expected to be online as early as 2030. The selected CMAR contractor will provide pre-construction services including design review, value engineering, and constructability reviews, followed by construction phase services.
Procurement and program contacts connected to Tarrant County.