Open RFP

Construction Management Services for New Heat Plant Northern State Correctional Facility 2559 Glen Road, Newport, VT RFP

Description: SEALED BID REQUEST FOR PROPOSAL Construction Management Services for New Heat Plant Northern State Correctional Facility 2559 Glen Road, Newport, VT ISSUE DATE: November 13, 2026 BIDDERS' CONFERENCE: December 9, 2026 at 9:00 AM QUESTIONS DUE BY: December 21, 2026 at 4:30 PM (EDT) RFP RESPONSES DUE BY: January 12, 2027 at 4:30 PM (EDT) STATE CONTACT: James Meyers, State Senior Purchasing Agent E-MAIL: BGS.OPCVendorDocs@vermont.gov Overview / Scope and Background: Through this Request for Proposal (RFP) the Department of Buildings and General Services (the "State") seeks to establish a contract with a construction management firm to provide Construction Management (CM) services for a New Heat Plant at the Northern State Correctional Facility (NSCF), 2559 Glen Road, Newport, Vermont. The project replaces end-of-life chunk wood boilers with a wood chip heating plant tied into existing building and oil boilers. The new plant must eliminate hand-loading operations, be appropriately sized for the 416-bed NSCF campus (nine buildings, ~137,368 sq. ft.), maintain heat and hot water during construction (backup systems must support the entire facility for periods >4 hours), provide temporary security fencing to isolate construction from facility daily operations, and construct a new permanent truck trap. Full bonding is required. Funding is provided in whole or in part through Vermont Capital Construction Act funds; Vermont prevailing wage and fringe rates apply. Contract Period: Period of performance commences March 8, 2027 and ends September 30, 2029. Project milestones include Preconstruction Start March 8, 2027; Construction Start June 30, 2027; Substantial Completion September 30, 2028; Project Completion October 30, 2028; Contract Completion (1 Year Warranty) September 30, 2029. Key Project Requirements / Deliverables: - CM to join at Design Development Document phase and provide pre-construction and construction services to enhance constructability, control cost, reduce change orders and schedule duration. - CM to accelerate completion of Heat Plant bid packages, pre-order long-lead items (e.g., electrostatic precipitator), and submit a Guaranteed Maximum Price (GMP) prior to construction start. - CM required to obtain minimum three bids on trade contracts and major supply items > $15,000 for GMP development. - Provide temporary and permanent security fencing and truck trap relocation/ construction; ensure access for emergency personnel at all times. - Demolish existing chunk wood boilers and woodshed and dispose off-site legally; construct new wood chip heat plant with storage bins and conveyors, connect to existing oil boiler room; pull power from the MDP so building is on generator backup. - Maintain commission, testing, as-built documentation, O&M manuals and commissioning coordination; complete commissioning and training. - All contractors must complete Department of Corrections background checks and PREA training before starting work on site. Project Budget: Project estimate (pre-construction and construction services, General Conditions, Cost of Work and contingencies): $3,200,000. Proposal Content and Evaluation: Proposals must include Cover Letter, Technical Response and Price Schedule and complete forms (Certificate of Compliance, Bid Proposal Form, Bid Bonding Form, Project Cost Matrix, etc.). Evaluation criteria: Strength and Experience of CM Team; Process; Fee Structure (pre-construction fixed fee, CM fixed fee, general conditions fixed fee, percent markup for change orders, mark-up for materials purchased, hourly rates). Scoring weights are provided in the RFP. Pre-construction Services and General Conditions: The RFP details required pre-construction services (constructability review, budget estimates, cost-saving/value engineering, site logistics, long-lead procurement), general conditions items (full-time and part-time supervision, site office, temporary utilities, safety programs, as-built drawings, security measures, dumpsters/tipping fees, temporary heat, trash removal, testing, commissioning attendance, punch lists), and that electronic submittal procedures will be used for project submittals and RFIs. Bonding, Wages, Compliance: Full bonding required (bid, performance, payment and guaranty bonds). Vermont prevailing wage and fringe benefit rates apply; additional worker classification compliance and subcontractor reporting requirements apply for bid amounts exceeding $250,000. Preference given to resident bidders and to those with practices that promote clean energy and address climate change, per the evaluation provisions. Submission / Closing Instructions (high-level): Bids must be received by the due date shown on the front page. Electronic bids only. See Submission Instructions below for full submission process and mandatory checklist of required documents.

Released
Nov 13, 2026
Closes
Jan 12, 2027(57 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts