Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of underground installation of approx. 7400' of 3" schedule 40 PVC conduit, excavation and preparation of electrical box pads, installation of the underground 3" conduit including two areas where directional boring must be completed. The roadway boring will include the placement of a 6" cast iron or PVC encasement where the line crosses.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
construction and renovation work associated with the MRI Upgrade/Installation (GE Artist EVO 1.5T) and the R/F Room Upgrade/Installation (GE Discovery 180) at Graham Regional Medical Center
Posted Date
Nov 27, 2025
Due Date
Dec 17, 2025
Release: Nov 27, 2025
Close: Dec 17, 2025
construction and renovation work associated with the MRI Upgrade/Installation (GE Artist EVO 1.5T) and the R/F Room Upgrade/Installation (GE Discovery 180) at Graham Regional Medical Center
AvailableHighway construction, ITS installation and other incidental work includes 41,200 CY rock excavation, 158,140 CY aggregate base course type C, 25,400 t hot mix asphalt 12.5 MM base, 1,900 SY emulsified asphalt sealcoat applied, 690 LF 30" reinforced concrete pipe class III, 67,100 LF woven fire fence metal posts.
Posted Date
Nov 26, 2025
Due Date
Dec 17, 2025
Release: Nov 26, 2025
Close: Dec 17, 2025
Highway construction, ITS installation and other incidental work includes 41,200 CY rock excavation, 158,140 CY aggregate base course type C, 25,400 t hot mix asphalt 12.5 MM base, 1,900 SY emulsified asphalt sealcoat applied, 690 LF 30" reinforced concrete pipe class III, 67,100 LF woven fire fence metal posts.
AvailableConstruction and Installation of Two (2) Non-illuminated Monument-style Ground Signs. The signs shall be constructed as monument-style structures not to exceed 20 feet in height and 20 feet in width, engineered to TxDOT specifications.
Posted Date
Dec 8, 2025
Due Date
Jan 12, 2026
Release: Dec 8, 2025
Close: Jan 12, 2026
Construction and Installation of Two (2) Non-illuminated Monument-style Ground Signs. The signs shall be constructed as monument-style structures not to exceed 20 feet in height and 20 feet in width, engineered to TxDOT specifications.
AvailableConstruction of air conditioning installation.
Posted Date
Sep 11, 2025
Due Date
Jan 14, 2026
Release: Sep 11, 2025
Close: Jan 14, 2026
Construction of air conditioning installation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis