Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct a new water conveyance system consisting of an open channel stream, a closed conduit, greenway.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Contract to provide closed loop industrial water treatment recycle system. To provide and install a water treatment recycle system for the auto wash bay. Product: closed loop industrial water treatment recycle system with 3,030 gallons per day process rate @ 15 gallons per minute. Includes a pressure relief valve, replacement cartridge filter, and a pump with float switch.
Posted Date
Dec 15, 2025
Due Date
Jan 15, 2026
Release: Dec 15, 2025
Close: Jan 15, 2026
Contract to provide closed loop industrial water treatment recycle system. To provide and install a water treatment recycle system for the auto wash bay. Product: closed loop industrial water treatment recycle system with 3,030 gallons per day process rate @ 15 gallons per minute. Includes a pressure relief valve, replacement cartridge filter, and a pump with float switch.
Premium
Access the largest public sector contact database
Construction of approximately 265 LF of restored stream, reconnected floodplain, rebuilt bank, and in-stream structures.
Posted Date
Jul 12, 2025
Due Date
Jan 28, 2026
Release: Jul 12, 2025
Close: Jan 28, 2026
Construction of approximately 265 LF of restored stream, reconnected floodplain, rebuilt bank, and in-stream structures.
AvailableConstruction of the Yankee Run Self-forming Channel.
Posted Date
Dec 16, 2025
Due Date
Jan 6, 2026
Release: Dec 16, 2025
Close: Jan 6, 2026
Construction of the Yankee Run Self-forming Channel.
AvailableWork include construction of new watermains, appurtenances, water service lines, meter vaults, installation of water meters, and installation of new water tank aeration system to improve and extend the town s existing water distribution system.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
Work include construction of new watermains, appurtenances, water service lines, meter vaults, installation of water meters, and installation of new water tank aeration system to improve and extend the town s existing water distribution system.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis