Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The proposed work includes the removal of the existing bridge and construction of a new 124'-0" three-span bridge with precast concrete deck girders, cast-in-place friction piling, concrete abutments, concrete pile encasements, wbeam railing, traffic control, and other required appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The proposed work includes the construction of a 168 foot, three-span, NU35 concrete i-girder bridge with steel Hpiling, concrete abutments, concrete piers, drilled shafts, SL-1 railing, traffic control, and other required appurtenances.
Posted Date
Jan 6, 2026
Due Date
Feb 4, 2026
Release: Jan 6, 2026
Close: Feb 4, 2026
The proposed work includes the construction of a 168 foot, three-span, NU35 concrete i-girder bridge with steel Hpiling, concrete abutments, concrete piers, drilled shafts, SL-1 railing, traffic control, and other required appurtenances.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of San Diego is soliciting proposals for Construction Management Services to support the Engineering & Capital Projects Department for the EMTS NTC Lab Remodel and NTC Lab Solar Implementation, including ELAP compliance upgrades, HVAC/mechanical/system modernizations, construction of a new Ocean Operations lab, and installation of photovoltaic systems. The solicitation is an RFP posted 2026-01-06 with proposals due 2026-02-10 16:00 PST (2026-02-11T00:00:00Z). The estimated construction cost is about $30 million and the Citys Purchasing & Contracting Department is the issuing office; contact listed is Edwin Ramos (ERRamos@sandiego.gov, 619-236-6682).
Posted Date
Jan 6, 2026
Due Date
Feb 11, 2026
Release: Jan 6, 2026
Close: Feb 11, 2026
The City of San Diego is soliciting proposals for Construction Management Services to support the Engineering & Capital Projects Department for the EMTS NTC Lab Remodel and NTC Lab Solar Implementation, including ELAP compliance upgrades, HVAC/mechanical/system modernizations, construction of a new Ocean Operations lab, and installation of photovoltaic systems. The solicitation is an RFP posted 2026-01-06 with proposals due 2026-02-10 16:00 PST (2026-02-11T00:00:00Z). The estimated construction cost is about $30 million and the Citys Purchasing & Contracting Department is the issuing office; contact listed is Edwin Ramos (ERRamos@sandiego.gov, 619-236-6682).
AvailableConstruction of approx. 1,090 LF of HDPE storm sewer, 93 LF of PVC gravity sewer main, 1,195 LF of new curb and gutter, and 1,593 LF of new 5' wide, ADA compliant sidewalk.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
Construction of approx. 1,090 LF of HDPE storm sewer, 93 LF of PVC gravity sewer main, 1,195 LF of new curb and gutter, and 1,593 LF of new 5' wide, ADA compliant sidewalk.
AvailableWork includes constructing the traffic signal upgrades (traffic signal backplate installation). Also includes 485 EA of miscellaneous equipment, backplate for existing vehicular signal head, 3 section; 11 EA of miscellaneous equipment, backplate for existing vehicular signal head, 4 section; see attached file.
Posted Date
Oct 10, 2025
Due Date
Jan 30, 2026
Release: Oct 10, 2025
Close: Jan 30, 2026
Work includes constructing the traffic signal upgrades (traffic signal backplate installation). Also includes 485 EA of miscellaneous equipment, backplate for existing vehicular signal head, 3 section; 11 EA of miscellaneous equipment, backplate for existing vehicular signal head, 4 section; see attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →