Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The proposed work includes the construction of a 168 foot, three-span, NU35 concrete i-girder bridge with steel Hpiling, concrete abutments, concrete piers, drilled shafts, SL-1 railing, traffic control, and other required appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of approx. 1,090 LF of HDPE storm sewer, 93 LF of PVC gravity sewer main, 1,195 LF of new curb and gutter, and 1,593 LF of new 5' wide, ADA compliant sidewalk.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
Construction of approx. 1,090 LF of HDPE storm sewer, 93 LF of PVC gravity sewer main, 1,195 LF of new curb and gutter, and 1,593 LF of new 5' wide, ADA compliant sidewalk.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes constructing the traffic signal upgrades (traffic signal backplate installation). Also includes 485 EA of miscellaneous equipment, backplate for existing vehicular signal head, 3 section; 11 EA of miscellaneous equipment, backplate for existing vehicular signal head, 4 section; see attached file.
Posted Date
Oct 10, 2025
Due Date
Jan 30, 2026
Release: Oct 10, 2025
Close: Jan 30, 2026
Work includes constructing the traffic signal upgrades (traffic signal backplate installation). Also includes 485 EA of miscellaneous equipment, backplate for existing vehicular signal head, 3 section; 11 EA of miscellaneous equipment, backplate for existing vehicular signal head, 4 section; see attached file.
AvailableProject consists of the clear and grubbing of approx. 35.3 acres of district property, placement of approx. 20,365 CY (as in-place fill) of material to construct the basin and channel levees, grading of approx. 27.98 acres of basin and channel bottoms, ripping and floating of basin bottoms, and the construction of the inter-basin structure.
Posted Date
Jan 6, 2026
Due Date
Feb 2, 2026
Release: Jan 6, 2026
Close: Feb 2, 2026
Project consists of the clear and grubbing of approx. 35.3 acres of district property, placement of approx. 20,365 CY (as in-place fill) of material to construct the basin and channel levees, grading of approx. 27.98 acres of basin and channel bottoms, ripping and floating of basin bottoms, and the construction of the inter-basin structure.
AvailableWork include construct a sand and salt storage building approximately 20'x40' 2-sand and salt storage area 14'x20' with 8' concrete walls and sliding access door 3-center open storage area 14'x20 with 8' chain link lockable gates 4-closed storage area 12'x20' w/ 8'x10' garage door and 36" side entry door, heavy duty shelves.
Posted Date
Jan 8, 2026
Due Date
Feb 4, 2026
Release: Jan 8, 2026
Close: Feb 4, 2026
Work include construct a sand and salt storage building approximately 20'x40' 2-sand and salt storage area 14'x20' with 8' concrete walls and sliding access door 3-center open storage area 14'x20 with 8' chain link lockable gates 4-closed storage area 12'x20' w/ 8'x10' garage door and 36" side entry door, heavy duty shelves.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →