Construct New Air Traffic Control Tower is a public solicitation to construct a new air traffic control tower in Oklahoma. The solicitation was published on 2026-06-26 and proposals are due 2026-08-05 at 10:00 AM CDT (08/05/2026 15:00:00Z). Bid documents and buyer contact information are not publicly available on the posting and require registration on the buyer portal to access full documentation.
Construct New Air Traffic Control Tower is a public solicitation to construct a new air traffic control tower in Oklahoma. The solicitation was published on 2026-06-26 and proposals are due 2026-08-05 at 10:00 AM CDT (08/05/2026 15:00:00Z). Bid documents and buyer contact information are not publicly available on the posting and require registration on the buyer portal to access full documentation.
The U.S. Army Corps of Engineers, Kansas City District intends to award a single firm‑fixed‑price Design‑Bid‑Build contract to construct a new Air Traffic Control (ATC) Tower, including foundation, steel framing, masonry, metal roof, fire detection and suppression, HVAC, electrical and telecommunications, backup generation, elevator, associated utilities/site work, and demolition of the existing tower. The notice estimates the project magnitude at between $20,000,000 and $40,000,000, with an estimated performance period of 730 calendar days from Notice to Proceed, and specifies bid and payment bond requirements. This posting is currently a presolicitation (solicitation expected on or about 2026-07-15); the formal solicitation and any attachments will be posted on the buyer’s site (SAM/PIEE) and the listing’s inactive/archive date is 2027-06-24.
The U.S. Army Corps of Engineers (USACE) Savannah District is soliciting bids (Solicitation W912HN26BA007, Project Number UHHZ063000) for the construction of a new Air Traffic Control Tower and Base Operations (Base Ops) facility at Robins Air Force Base in Georgia. The facility will feature reinforced concrete foundations and footings, brick veneer and insulated metal panel exterior walls, and a structural steel frame tower; functional areas include offices, a simulator room, a control cab, and supporting utility systems including a 750 kW backup generator. Responses to this Invitation for Bid (IFB) must be submitted electronically via the SAM.gov / PIEE Solicitation Module by 11:00 AM Eastern Daylight Time on July 23, 2026.
The project generally consists of architectural, structural, mechanical, and electrical improvements to the Air Traffic Control Tower (ATCT), including replacement of groundlevel ventilation louvers and HVAC upgrades; exterior waterproofing, repairs, cleaning, and painting of tower walls and cab metal panels; installation of a permanent roof over the ground-level electrical room; replacement of the cab roofing, glazing system, hurricane shutters, window seals, ground-level exterior doors, and associated components; corrosion repair and recoating of catwalk handrails; inspection and minor maintenance of fire protection systems; replacement of the fire alarm and lightning protection systems; and installation of new conduit supports at the cab roof. Bid alternates include repair of exterior stucco on concrete tie beams and columns..
The project generally consists of architectural, structural, mechanical, and electrical improvements to the Air Traffic Control Tower (ATCT), including replacement of groundlevel ventilation louvers and HVAC upgrades; exterior waterproofing, repairs, cleaning, and painting of tower walls and cab metal panels; installation of a permanent roof over the ground-level electrical room; replacement of the cab roofing, glazing system, hurricane shutters, window seals, ground-level exterior doors, and associated components; corrosion repair and recoating of catwalk handrails; inspection and minor maintenance of fire protection systems; replacement of the fire alarm and lightning protection systems; and installation of new conduit supports at the cab roof. Bid alternates include repair of exterior stucco on concrete tie beams and columns..
Win Opportunities Before the RFP
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
The U.S. Army Corps of Engineers, Kansas City District intends to award a single firm‑fixed‑price Design‑Bid‑Build contract to construct a new Air Traffic Control (ATC) Tower, including foundation, steel framing, masonry, metal roof, fire detection and suppression, HVAC, electrical and telecommunications, backup generation, elevator, associated utilities/site work, and demolition of the existing tower. The notice estimates the project magnitude at between $20,000,000 and $40,000,000, with an estimated performance period of 730 calendar days from Notice to Proceed, and specifies bid and payment bond requirements. This posting is currently a presolicitation (solicitation expected on or about 2026-07-15); the formal solicitation and any attachments will be posted on the buyer’s site (SAM/PIEE) and the listing’s inactive/archive date is 2027-06-24.
The U.S. Army Corps of Engineers (USACE) Savannah District is soliciting bids (Solicitation W912HN26BA007, Project Number UHHZ063000) for the construction of a new Air Traffic Control Tower and Base Operations (Base Ops) facility at Robins Air Force Base in Georgia. The facility will feature reinforced concrete foundations and footings, brick veneer and insulated metal panel exterior walls, and a structural steel frame tower; functional areas include offices, a simulator room, a control cab, and supporting utility systems including a 750 kW backup generator. Responses to this Invitation for Bid (IFB) must be submitted electronically via the SAM.gov / PIEE Solicitation Module by 11:00 AM Eastern Daylight Time on July 23, 2026.