Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This procurement solicits work for fence repairs at two locations: Choccolocco Wildlife Management Area (WMA) and the WFF District 2 office, including installing a new cantilever slide gate, repairing an existing double gate, and removing and reinstalling a section of chain link fence. The bidder must provide all labor, materials, supplies, and equipment for both locations; a mandatory site visit is scheduled for 2026-01-21 at 10:00 AM (starting at 4101 AL Hwy 21 N, Jacksonville, AL and proceeding to 1639 Joseph Springs Motorway, Anniston, AL). The solicitation is a Request for Quotation with an AI budget estimate of $10,000â$50,000 and a close date of 2026-01-23.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes to install 1 new 16' cantilever slide gate (manual operation) with 3 - 4" gate posts and hardware, repair existing double gate to level and ability to lock with gate latch, add single wheel rollers to each, take down approx 343" of 6' galvanized chain link fence, necessary posts and 3 strands of barbed wire, reinstall all fence materials in connection with remaining fence to incorporate newly cleared space.
Posted Date
Jan 7, 2026
Due Date
Jan 23, 2026
Release: Jan 7, 2026
Close: Jan 23, 2026
Work includes to install 1 new 16' cantilever slide gate (manual operation) with 3 - 4" gate posts and hardware, repair existing double gate to level and ability to lock with gate latch, add single wheel rollers to each, take down approx 343" of 6' galvanized chain link fence, necessary posts and 3 strands of barbed wire, reinstall all fence materials in connection with remaining fence to incorporate newly cleared space.
AvailablePurchase of two (2) gooseneck trailers.
Posted Date
Jan 7, 2026
Due Date
Feb 3, 2026
Release: Jan 7, 2026
Close: Feb 3, 2026
Purchase of two (2) gooseneck trailers.
AvailableThe Florida Fish and Wildlife Conservation Commission seeks competitive bids to repair the exterior log walls and related elements of the state residence at Joe Budd Wildlife Management Area in Midway, Florida. Work includes surface preparation, repairing decayed logs and chinking, sealing gaps with caulk and preservative treatments, finishing with primer/sealer and stain, and sealing a chimney-to-wall gap to prevent water intrusion. Bidders must have at least five years of log home restoration experience; work must start within 30 days of PO issuance and be completed by June 15, 2026.
Posted Date
Jan 6, 2026
Due Date
Jan 28, 2026
Release: Jan 6, 2026
Close: Jan 28, 2026
The Florida Fish and Wildlife Conservation Commission seeks competitive bids to repair the exterior log walls and related elements of the state residence at Joe Budd Wildlife Management Area in Midway, Florida. Work includes surface preparation, repairing decayed logs and chinking, sealing gaps with caulk and preservative treatments, finishing with primer/sealer and stain, and sealing a chimney-to-wall gap to prevent water intrusion. Bidders must have at least five years of log home restoration experience; work must start within 30 days of PO issuance and be completed by June 15, 2026.
Hackberry Flat Wma Water Control Structures.
Posted Date
Dec 16, 2025
Due Date
Jan 13, 2026
Release: Dec 16, 2025
Close: Jan 13, 2026
Hackberry Flat Wma Water Control Structures.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis